Control Panel
Secondary Disconnect
& Tank Penetration
Source Power
SN Machine
Submersible cable ran from tank penetration to
SN machine.
Electrical conduit ran to top of tank, 4
Conductors sized according to NEC.
Spray system installed through hatch. Tethered
with dual tether system
Electrical Control Panel located at bottom of
tank.
Blower placed over top of machine.
Blower size depends on tank specifics and
application. (Blower shown as roof mount,
certain models may require ground mount.)
Machine safety disconnect located near tank
entry
© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | info@medoraco.com
Placement
Placement Overview
SN Large Frame Series
10041_20200221
O&M_SN10_10030_10104_20201006 - 4