Support: 855-473-7449 or 408-943-4100 Email: support@ixsystems.com
Page 3
3 ES24 Rail Kit Assembly
3.1 Separate Cabinet Rails from Rack Rails
Extend the inner rack rail until it locks in place (
1
)� Slide out the cabinet rail until it stops (
2
)� Remove the cabinet
rail by sliding the white release tab away from the inner rack rail (
3
), then pull the cabinet rail free (
4
)�
The cabinet rails are mounted on both sides of the system cabinet� Align the cabinet rail key holes with the
three posts on the side of the chassis and slide the rail until the post is secured in the key holes lot of the rail�
3.2 Mount Cabinet Rails
Align the rail hole with the screw hole and secure the rail with one M 4x4 L screw� Repeat this process to mount
and secure the second cabinet rail on the other side�
A TrueNAS ES24 requires 4U of vertical rack space� The rack rails are installed in the bottom 2U of the total
4U height� The inner rack rail must be unlocked and retracted before installing the rail in the rack� Rotate the
release lever on the back of the inner rail clockwise as shown on the arrow label (
1
)� Push the inner rail towards
the back of the rail assembly until it stops (
2
)�
3.3 Mount the Rack Rails
Place the rail in the rack with the front end toward the front of the rack, aligning the pins with the mounting
holes in the front of the rack� Push the pins in to the holes until the latch clicks� At the rear end of the rail, align
the pins with the rack holes, making sure the rail is level� Swing the gray latch handle outward (
1
) and pull it to
extend the rail rearwards until the railpins are fully seated in the rack holes (
2
)� Release the latch to allow it to
lock into place� Repeat the process for the second rack rail�