14
March 1
st
, 2015
General stove installation steps.
1) Read the entire owner and installation manual before
install and use your stove.
2) Chose a spot where to install your cook stove. Read
section about floor protection dimension and about
localisation of stove over the floor protection plate, and
for combustible material clearance. Once you have
decided where to install the stove, mark the roof at the
center of chimney
o
To be sure that the vertical center of the
chimney is set. Use a plumb line and mark the
center on the floor.
3) Check if it possible to pass chimney without damaged
the structural integrity of your house, if so, you have to
move the location of the stove while keeping the
minimum clearance or more to be sure. If you can’t
move the stove and have to cut through a beam. Be
sure to keep the structural integrity of your house by
following state of the art and National building code.
Note: This appliance have to be connected to 6 inches
(15.24 cm) factory build chimney HT UL 103 or CAN/ULC
S629 compliant or a 6 inches (15.24 cm) masonry chimney
with a homologated sleeve inside.
4) Install the chimney following the manufacturer
instruction.
5) Put the stove directly on the floor aligned vertically with
the center of chimney, and trace the side of the stove
on the floor and remove it.
6) Trace the protection floor at 8 inches (20.3 cm) offset
clearance from the side and the back of the stove and
then trace the front offset clearance at 16 inches (40.6
cm) In US and 18 inches (45 cm) in Canada. From the
front of the door opening.
7) Install the floor protection plate inside the last mark. (It
must be non-combustible)
8) Put the stove on the protection floor plate and respect
the offset clearance set at step 6. Be sure to centering
chimney with the flue collar. We recommend to fix the
stove to the floor with bolt in the slot make for that.in
the legs.
9) If you have an outside air inlet you must use 4 inches
(10.16 cm) flexible aluminum pipe. The pipe must be
sealed with thermal resistant sealant
10) Install the chimney connector on the stove collar first
and screw it with 3 screws, then continue with the next
chimney connector section up to the chimney support
collar. Always use 3 screw on each joint section.
Note:
•
The single wall or double wall chimney connector
must be 6 inches diameter and have a minimum
thickness of 24 gauge (0.025 inches 0.64 mm)
•
Do not use galvanised steel chimney connector.
•
.