13
November 5, 2015
Floor firebricks installation
1) Put 2 bricks «A» in the bottom as shown in the picture.
2) Insert 4 bricks «A» in front of the 2 bricks previously placed.
3) Insert 1 brick «A» to the right from the ash dump plug.
4) Insert 1 brick «D» to the left from the ash dump plug.