INSTALLATION
1
Installation
Dia.1.
1.
Un
-
screw the top section of the fitting.
2.
Remove the protective tab from the
battery compartment.
3.
Re
-
screw the top section of the fitting.
4.
Attach the pole to the fitting as illustrated.
5.
Remove the spike from the pole.
6.
Attach the spike to the pole in the posi-
tion illustrated.
7.
Place the fitting on the required position
and test.
The LED light only can operate under a dark
atmosphere.
Battery Replacement (If required).
Dia.02.
1.
Un
-
screw the top section of the fitting.
2.
Open the battery compartment.
3.
Remove old battery.
4.
Insert new battery.
5.
Close the battery compartment
6.
Re
-
screw the top section of the fitting.
This product is suitable to use Nickel metal
Hybrid battery, abbreviated NI
-
MH, any
other batteries type are not accepted.
Cleaning
-
Use a clean dry soft or slightly damp cloth.
-
Do not use abrasive cloths or polishes as this may
cause damage to the product.
APPROVED
06/11//2019
ISSUE 1
Q.C
Maintenance
PD483
J D Williams & Company Limited is part of N Brown Group plc. Griffin House,
40 Lever Street, Manchester, M60
6ES
Dia.1
Dia.2
2
3
4
5
6
7
REMOVE
THIS TAB
1
2
3
4
5
6