background image

Connect the 24VDC power supply to the
mains (230VAC)

Electrical Connection and Start-up

Helmholtzstrasse 13                                              Phone +49 (0)781 / 206-0                                 
77652 Offenburg                                                    Fax     +49 (0)781 / 2 53 18
Werner-von-Siemens-Strasse 12                           www.j-schneider.de
77656 Offenburg-Elgersweier                                info@j-schneider.de 

Parameterizing-Software

Shutdown-Software

1.

Connect the C-

TEC

 

P

 to the output of

 24VDC power supply

2.

3.

Connect the load to the buffered 
24VDC output of the C-

TEC

4.

Wiring of the inputs/outputs

Switch on the power supply.
The C-

TEC

 

P

 is charging. 

The LED „Netz/Mains“ illuminate

5.

6.

C-

TEC

 is completely charged. 

The LEDs „Netz/Mains“ and „U /V

>“

C

cap 

illuminate

 

ATTENTION! The safety notes of the operating instructions have to be regarded.
Installation and wiring work may only be carried out by qualified electricians.
The sheet „Quickstart“ is only a support.

The 

TEC

Control-Software automates the system-shutdown at

power failure and the controlled system-restart after
power recovery.

Please ask for further information!

Device parameters such as output voltage, permissible voltage
range, general error a.s.o. can be adjusted with the para

TEC

software.

Please ask for further information!

Reviews: