User manual
AKKU
TEC
2412 VdS
Document
page 1 / 16
0812G01B02-160422.docx
J. Schneider Elektrotechnik GmbH
Helmholtzstraße13, 77652 Offenburg · Postfach 2327, 77613 Offenburg · Werner-von-Siemens-Straße 12, 77656 Offenburg
Tel +49 (0) 781 206 0 · Fax +49 (0) 781 253 18 ·
info@j-schneider.de
·
www.j-schneider.de
· Amtsgericht Freiburg HRB 470458
Geschäftsführer: Dipl.-Betriebswirtin (BA) Bettina Schneider · Dipl.-Wirt,-Ing. (FH) Rolf Anti · UST-Ident-Nr. DE142532740
DC-USV
NBPA0812G01***
VdS-Nummer G209169
0786-CPD-20873
page
1.
General ...................................................................................................................... 2
1.1
General safety notes
1.2
Short description
2
Transportation and storage ..................................................................................... 3
3
Installation and connection ..................................................................................... 3
3.1
Installation
3.2
Connection
3.3
Connection lead accumulator
3.4
Connection of mains voltage
3.5
Connection load
3.6
Signal contacts
3.7
Circuit diagram
4
Start-Up ..................................................................................................................... 9
4.1
Display and messages
5
Operation .................................................................................................................. 9
5.1
Mains operation
5.2
Back-up operation
5.3
Deep discharge protection
5.4
Accumulator circuit monitoring
5.5
Accumulator test
5.6
Temperature tracking (optional)
5.7
Shut-Down
5.8
Acoustic alarm transmitter (optional)
6
Master/Slave-operation at parallel connection ..................................................... 11
6.1
Connection at Master/ Slave-operation
6.2
Signalisation at Master/Slave-operation:
6.3
Shutdown at Master/Slave-operation
6.4
Configuration Master/Slave
7
Servicing .................................................................................................................. 13
7.1
Testing the lead accumulators
7.2
Exchanging the lead accumulators
8
Decommissioning .................................................................................................... 14
9
Disposal ................................................................................................................... 14
10
Norms and regulations ........................................................................................... 14
11
Technical Data ......................................................................................................... 15
12
Accessories ............................................................................................................. 16