Engine Overhaul Manual
Jabiru Aircraft
Pty Ltd
Jabiru 2200 & 3300 Aircraft Engines
This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.
ISSUE
1
2
3
4
5
6 7
Dated : 28/10/2014
Issued By: AS
Page: 181 of 201
L:\files\Manuals_For_Products\Engine_Manuals\Overhaul_Manual\JEM0001-7_Overhaul_Manual_DRAFT_(29_10_14).docx
9.10.5 Top End Subassembly F Build Sheet
– Gear Case
Table 30
– Top End Build Sheet F
No.
Details
Para
Initials
Checked By
Date
F1
Deburr, clean and inspect all of the gears
F2
Measure the shaft post internal diameters and the
distributor shaft diameters
F3
Fit new crankshaft timing gear
F4
Using loctite 515 fit the shaft posts to the gear
housing
F5
Fit the distributor shaft seals and rear crankshaft
seal
F6
Fit shafts to gears
F7
Fit the distributor shafts and gears to the gear
housing
F8
Check End Clearance of Distributor Shaft to Case
Flange
F9
Record measurements & clearances in build
record sheet - Table 26. Ensure all measurements
and clearances are within the appropriate limits
given in Table 10 and Table 12
-
F10
Stage F - Stage Inspection of Assembly
I hereby certify that the above subassembly has been assembled in accordance with the applicable Jabiru
Pty Ltd Instructions and Maintenance procedures.
Signed:
Date:
for Jabiru Aircraft Pty Ltd