Page No: 77
Issue No: 2
Date: 031100
Issued By: PJA
Jabiru 3300 – Component Assembly Procedure
Subassembly B – Crankcase and Camshaft Assembly
No. Details Sign
Date
B1
Inspect case, deburr, clean, check oil holes
B2
Fit inner stud “O” rings
B3
Fit all studs
B4
Fit outer oil suction and conrod welch plugs
B5
Fit oil relief valve, oil pressure sender and
pressure switch
B6
Fit bearing shells (16)
B7
Assemble and torque to 30 ft.lbs
B8
Measure main tunnel and camshaft bearings
B9
Measure Cam Follower Bores
B10 Fit
Lifters
B11
Check Camshaft End Float
B12
Check Crankshaft End Float
I hereby certify that the subassembly has been completed using the approved procedures
and data; and is fit for installation.
Signed: _______________
Date: ____________
For Jabiru Aircraft Pty Ltd
Certificate of Approval #3501
Notes:
Summary of Contents for 3300
Page 4: ...Page No 4 Issue No 1 Date 031100 Issued By PJA List of Amendments Page Amendment Date Issue...
Page 8: ...Page No 8 Issue No 1 Date 031100 Issued By PJA 1 1 Denomination of Cylinders...
Page 11: ...Page No 11 Issue No 1 Date 031100 Issued By PJA 3 0 PERFORMANCE GRAPHS...
Page 48: ...Page No 48 Issue No 1 Date 031100 Issued By PJA...
Page 52: ...Page No 52 Issue No 1 Date 031100 Issued By PJA...
Page 67: ...Page No 67 Issue No 1 Date 031100 Issued By PJA Drawing 9430064...
Page 89: ...Page No 89 Issue No 2 Date 031100 Issued By PJA...