Page No: 79
Issue No: 2
Date: 031100
Issued By: PJA
Jabiru 3300 – Component Assembly Procedure
Subassembly C – Pistons, Cylinders and Cylinder Heads
No. Details Sign
Date
C1
Clean and deburr all parts
C2
Record all measurements
C3
Install pushrod tube “O” Rings
C4
Check valve seats, fit spring retainers, install
valves
C5
Fit intake pipes to heads
C6
Complete rocker shafts and rocker assemblies
C7
Fit cylinder base “O” rings
C8
Fit front circlip
C9
Check ring end gaps, fit rings to pistons
C10
Install piston assembly to cylinder just clear of
the oil ring
I hereby certify that the subassembly has been completed using the approved procedures
and data; and is fit for installation.
Signed: _______________
Date: ____________
For Jabiru Aircraft Pty Ltd
Certificate of Approval #3501
Notes:
Summary of Contents for 3300
Page 4: ...Page No 4 Issue No 1 Date 031100 Issued By PJA List of Amendments Page Amendment Date Issue...
Page 8: ...Page No 8 Issue No 1 Date 031100 Issued By PJA 1 1 Denomination of Cylinders...
Page 11: ...Page No 11 Issue No 1 Date 031100 Issued By PJA 3 0 PERFORMANCE GRAPHS...
Page 48: ...Page No 48 Issue No 1 Date 031100 Issued By PJA...
Page 52: ...Page No 52 Issue No 1 Date 031100 Issued By PJA...
Page 67: ...Page No 67 Issue No 1 Date 031100 Issued By PJA Drawing 9430064...
Page 89: ...Page No 89 Issue No 2 Date 031100 Issued By PJA...