Page No: 81
Issue No: 2
Date: 031100
Issued By: PJA
Jabiru 3300 – Component Assembly Procedure
Subassembly D - Sump
No. Details Sign
Date
D1
Deburr and wash sump, inspect for defects
D2
Fit oil temperature sender
I hereby certify that the subassembly has been completed using the approved procedures
and data; and is fit for installation.
Signed: _______________
Date: ____________
For Jabiru Aircraft Pty Ltd
Certificate of Approval #3501
Notes:
Summary of Contents for 3300
Page 4: ...Page No 4 Issue No 1 Date 031100 Issued By PJA List of Amendments Page Amendment Date Issue...
Page 8: ...Page No 8 Issue No 1 Date 031100 Issued By PJA 1 1 Denomination of Cylinders...
Page 11: ...Page No 11 Issue No 1 Date 031100 Issued By PJA 3 0 PERFORMANCE GRAPHS...
Page 48: ...Page No 48 Issue No 1 Date 031100 Issued By PJA...
Page 52: ...Page No 52 Issue No 1 Date 031100 Issued By PJA...
Page 67: ...Page No 67 Issue No 1 Date 031100 Issued By PJA Drawing 9430064...
Page 89: ...Page No 89 Issue No 2 Date 031100 Issued By PJA...