Page No: 91
Issue No: 2
Date: 031100
Issued By: PJA
Run-In Checks
1.
Preliminary
Paperwork
Complete
Sufficient
Fuel
Correct Oil Level
All Connections Correct and Secure
2.
Start Run
Start
Time
_____________
End
Time
_____________
3.
Ignition Checks (repeat a couple of times for each side)
Left
Side
1000/2000
rpm
Right Side
1000/2000 rpm
4.
Oil Leaks
Check
Visually
5.
Instruments
Working and Correct Range
6.
Idle
Check idle screw (650 Low Idle; 2700 High Idle)
7.
General Running
Smoothness
Noises
Manifold
Sealing
8.
Oil Pressure and Temp
9.
Prop Tacho
10.
Check alternator Charging Voltage
Jabiru 3300 – Engine Post Run Procedure
SIGN DATE
1. Heads retorqued 32 Nm (24 ft/lb). Valves Adjusted.
2. Check induction/exhaust bolts.
3. Any changes to be made.
4. Rerun, check for oil leaks and/or any modifications made (oil pressure/leaks etc).
5. Check charging rate of alternator
Volts
6. Leak Down
80
80
80 80 80 80
Cyl
1
2
3
4
5
6
7. Check all paper work
8. Drain fuel/oil. Prepare for Shipment.
Summary of Contents for 3300
Page 4: ...Page No 4 Issue No 1 Date 031100 Issued By PJA List of Amendments Page Amendment Date Issue...
Page 8: ...Page No 8 Issue No 1 Date 031100 Issued By PJA 1 1 Denomination of Cylinders...
Page 11: ...Page No 11 Issue No 1 Date 031100 Issued By PJA 3 0 PERFORMANCE GRAPHS...
Page 48: ...Page No 48 Issue No 1 Date 031100 Issued By PJA...
Page 52: ...Page No 52 Issue No 1 Date 031100 Issued By PJA...
Page 67: ...Page No 67 Issue No 1 Date 031100 Issued By PJA Drawing 9430064...
Page 89: ...Page No 89 Issue No 2 Date 031100 Issued By PJA...