CANADIAN FURNACES ONLY
All Jack furnaces that are shipped to Canada will
include an insulated front panel casing and an
insulated back panel casing.
Big Jack (BJ90-C)
Front panel installation:
Slide front panel down to straddle over the firing
door. Press top of panel in securely. Attach to
furnace by lining up the screw holes (pre punched
on flange and holes on black steel and screwing in
2 screws (furnished).
Back panel installation:
Slide hole in panel casing over the flue collar of the
furnace (do this prior to connecting smoke pipe),
press tight to back of furnace, line up pre drilled
holes in bottom flange of casing and black steel of
the furnace. Secure with 3 screws (furnished).
CANADIAN MODELS
SJ125-C AND BJ90-C
ONLY
CANADIAN MODELS
SJ125-C AND BJ90-C
ONLY
Super Jack (SJ125-C)
Front panel installation:
With firing door open, pull damper rod all the way
out. Slide panel casing on by tilting and maneuver-
ing all the way to the right and up - taking care that
the fire door hinges are missed. Snug the left side
to the furnace front, line up the holes in the bottom
flange on the casing and on the black steel of
furnace (pre drilled), screw in the two screws (fur-
nished) to secure front panel.
Back panel installation:
Slide hole in panel casing over the flue collar of the
furnace (do this prior to connecting smoke pipe),
press tight to back of furnace, line up pre drilled
holes in bottom flange and black steel of furnace.
Secure with 3 screws (furnished)
Installation
23
Super Jack Model Shown
Summary of Contents for BIG BJ90
Page 11: ...3 1 2 4 5 6 7 8 9 Furnace Features SJ125...
Page 13: ...1 2 3 4 5 6 7 Furnace Features BJ90 13...
Page 46: ...SUPER JACK SJ125 Exploded Views Parts Lists 46...
Page 48: ...BIG JACK BJ90 Exploded Views Parts Lists 48...
Page 53: ...Notes...
Page 54: ...Notes Notes...
Page 55: ...Notes...