CONFIDENTIAL
PROJECT NAME
| date
项目名称
|
日期
9
Operation Instructions-
Parameter List
33. 2
Set the stitch number for catching thread
1~7 stitch
2
34.--
Could delay the synchronized time of catching
thread
-10~0
0
- slower
35. 0
Could limit the catching control action of upper
thread
0:normal
1:limited
0
36.--
Choose the synchronized time of feeding
When tension has problem, change to “-”number
-8~16
12
The needle may be
broken if move too
much to “-”. Pay
attention to the heavy
material.
37. 0
Presser foot state in the end of sewing
0:Presser foot up
1:Use the pedal to control
0
39. 0
Set for searching for original point each time
(Except for periodic sewing)
0:Don’t search for original point
1:Searching for original point
0
More details in
【3.3Setting of reset】
31. 0
Could be stopped by keyboard(reset key)
0:Invalid
1:Reset key
0
32. 1
Could limit the alarm
0:Don’t have alarm
1:Controlled by keyboard
1
Summary of Contents for JK-1900BSK
Page 1: ...CONFIDENTIAL PROJECT NAME date 1 1900BSK LED PANAL of DAHAO...
Page 14: ...CONFIDENTIAL PROJECT NAME date 14 Operation Instructions Patterns for bar tacking...
Page 15: ...CONFIDENTIAL PROJECT NAME date 15 Operation instruction List of bartack patterns...
Page 16: ...CONFIDENTIAL PROJECT NAME date 16 Operation instruction List of buttonattaching patterns...
Page 17: ...CONFIDENTIAL PROJECT NAME date 17 Operation instruction List of buttonattaching patterns...