Big Jack
Super Jack
Junction Box
Mounting Bracket
Junction Box
Mounting Bracket
Draft Inducer Motor
Draft Inducer Motor
Remove the three (3) self tapping screws off the front
of the furnace. (Set aside) Line up the gasket to the
mounting flange of the draft inducer and using the 3
screws, tighten onto the front of the furnace.
See Fig. 3
4x4 Junction Box
Big Jack
Attach the junction box with the transformer/relay to
the mount provided at the top right hand side of the
front of the furnace. See Fig. 4
Note: BJ90-C (Canadian Model)
Attach by mounting the junction box onto insulated
panel and place screws into two holes pre-punched
into panel casing.
Super Jack
Attach the junction box with the transformer/relay to
the mount provided at the bottom right hand side of
the front of the furnace. See Fig. 5
FIG. 3
FIG. 4
FIG. 5
24
Installation
Summary of Contents for SUPER SJ125
Page 11: ...3 1 2 4 5 6 7 8 9 Furnace Features SJ125 ...
Page 13: ...1 2 3 4 5 6 7 Furnace Features BJ90 13 ...
Page 46: ...SUPER JACK SJ125 Exploded Views Parts Lists 46 ...
Page 48: ...BIG JACK BJ90 Exploded Views Parts Lists 48 ...
Page 53: ...Notes ...
Page 54: ...Notes Notes ...
Page 55: ...Notes ...