JP-24 Technical Manual 7610-002-49-79 Rev. D
Issued: 03-06-2006 Revised: N/A
SECTION 1: SPECIFICATION INFORMATION
SPECIFICATIONS of the JP-24/JP-24F
2
PERFORMANCE/CAPABILITIES
OPERATING CAPACITY
(RACKS/HOUR)
RACKS PER HOUR
30
DISHES PER HOUR
600
GLASSES PER HOUR
600
OPERATING CYCLE
(SECONDS)
WASH TIME
82
DRAIN TIME
28
RINSE TIME
10
TOTAL CYCLE TIME (MINUTES)
2
5 MINUTE TIMER OPERATING CYCLE
(SECONDS)
WASH TIME
262
DRAIN TIME
28
RINSE TIME
10
TOTAL CYCLE TIME (MINUTES)
5
TANK CAPACITY
(LITERS) (GALLONS)
WASH TANK (21.5) 5.65
TEMPERATURES
WASH --- (MINIMUM) (65.6°C) 150°F
RINSE --- (MINIMUM) (82.2°C) 180°F
WATER REQUIREMENTS
INLET TEMPERATURE
(82.2°C) 180°F
GALLONS PER HOUR
(198.7L) 52.3
WATER LINE SIZE I.P.S. (Minimum) (1.27 cm) 1/2”
DRAIN LINE SIZE I.P.S. (Minimum) (3.81 cm) 1 1/2”
FLOW PRESSURE P.S.I.
20
A
5
FLOW, GALLONS PER MINUTE
(27L) 7.1
ELECTRICAL REQUIREMENTS
WASH MOTOR HP
3/4
NOTE: Typical Electrical Circuit is based upon (1) 125% of the
full amperage load of the machine and (2) typical fixed-trip cir-
cuit breaker sizes as listed in the NEC 2002 Edition. Local
codes may require more stringent protection than what is dis-
played here. Always verify with your electrical service con-
tractor that your circuit protection is adequate and meets all
applicable national and local codes. These numbers are pro-
vided in this manual simply for reference and may change
without notice at any given time.
JP-24/JP-24F:
RINSE
TYPICAL
HEATER
TOTAL ELECTRICAL
VOLTS
PH
HZ
RATINGS
AMPS
CIRCUIT
208 1 50 900KW
12
15 AMP
230 1 50
1100KW
12
15 AMP
208 1 60 900KW
10
15 AMP
230 1 60
1100KW
10
15 AMP
NOTE: Always refer to the machine data plate for specific
electrical and water requirements. The material provided on
this page is for reference only and may be subject to change
without notice.
Summary of Contents for Hot Water Sanitizing Undercounter Dishmachines JP-24
Page 2: ......
Page 6: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Page 10: ...SECTION 2 INSTALLATION OPERATION INSTRUCTIONS 5 ...
Page 16: ...SECTION 3 PREVENTATIVE MAINTENANCE 11 ...
Page 18: ...SECTION 4 TROUBLESHOOTING 13 ...
Page 21: ...16 SECTION 5 SERVICE PROCEDURES ...
Page 34: ...SECTION 6 PARTS SECTION 29 ...