07610-002-23-32-AD
8
INSTRUCTIONS
INSTALLATION
Before installing the unit, check the packaging and machine for damage. If the packaging
is damaged, the machine might also be damaged. If there is damage to both packaging
and machine, do not throw away the packaging. The machine has been inspected and
packed at the factory and is expected to arrive to you in new, undamaged condition.
However, rough handling by carriers or others might result in damage to the unit while
in transit. If so, do not return the unit to the manufacturer. Instead, contact the carrier
and ask them to send a representative to the site to inspect the damage and complete
an inspection report. You must contact the carrier and the dealer that sold you the unit
within 48 hours of receiving the machine.
While unpacking the machine, ensure that there are no missing parts. If an item is
missing, contact the manufacturer immediately.
While unpacking an HH-E-VER unit, note that the VER system is packaged separately.
Click
here
or on the instructions icon for a guide on mounting the VER system to the
machine.
The machine must be level in its operating location to prevent damage to the machine
during operation and to ensure the best results. The unit comes with four adjustable
bullet feet, which can be turned using a pair of channel locks (or by hand if the unit can
be raised safely). Ensure that the unit is level from side-to-side and front-to-back before
making any connections.
Plumbing connections must comply with all applicable local, state, and national
plumbing codes. The plumber is responsible for ensuring that the incoming water line
is thoroughly flushed before connecting it to any component of the machine. It is very
important to remove all foreign debris from the water line that might potentially get
trapped in the valves or cause an obstruction. Any valves that are fouled as a result of
foreign matter left in the water line—and any expenses resulting from this fouling—are
not the responsibility of the manufacturer.
A water hardness test must be performed to determine if a water treatment system
needs to be installed.
If water hardness tests at greater than 3 GPG, install the Scaltrol Water Treatment
system (see the Plumbing Options page) into the water line before the machine’s
incoming water connection point. A water shut-off valve should be installed to allow
access for service.
INSPECTION
LEVELING
UNPACKING
PLUMBING
A water hardness test
MUST be performed.
Do not throw away
packaging if damage is
evident!
WATER SUPPLY
CONNECTION:
WATER HARDNESS
GREATER THAN
3 GPG
The plumber MUST flush
the incoming water line!
HH-E-VER
ASSEMBLY
Summary of Contents for TEMPSTAR HH-E
Page 35: ...07610 002 23 32 AD 26 1 5 4 2 3 6 7 10 8 9 HOOD PARTS...
Page 61: ...07610 002 23 32 AD 52 VER SYSTEM PARTS 18 24 23 12 11 16 17 14 21 22 20 19 27 28 29...
Page 67: ...07610 002 23 32 AD 58 SCHEMATICS HH E VER 208 230 V NEW RINSE TANK...
Page 68: ...59 07610 002 23 32 AD SCHEMATICS HH E VER 460 V NEW RINSE TANK...
Page 69: ...07610 002 23 32 AD 60 SCHEMATICS HH E VER 208 230 V OLD RINSE TANK...
Page 70: ...61 07610 002 23 32 AD SCHEMATICS HH E VER 460 V OLD RINSE TANK...
Page 71: ...07610 002 23 32 AD 62 SCHEMATICS NB 208 230 V...
Page 72: ...63 07610 002 23 32 AD SCHEMATICS NB 460 V...
Page 73: ...07610 002 23 32 AD 64 SCHEMATICS HH S 208 230 V...
Page 74: ...65 07610 002 23 32 AD SCHEMATICS SDI OPTIONS...
Page 75: ......