PLUMBING CHECK:
Slowly turn on the water supply to the machine after the incoming fill line and the drain line have been
installed. Check for any leaks and repair as required. All leaks must be repaired prior to placing the machine in operation.
ELECTRICAL POWER CONNECTION:
Electrical and grounding connections must
comply with the applicable portions of the National Electrical Code ANSI/NFPA 70
(latest edition) and/or other electrical codes.
Disconnect electrical power supply and place a tag at the disconnect switch to indi-
cate that you are working on the circuit.
The dishmachine data plate is located on the right side and to the front of the
machine. Refer to the data plate for machine operating requirements, machine volt-
age, total amperage load and serial number.
To install the incoming power lines, open the control box. This will require taking a
phillipshead screwdriver and removing the four (4) screws on the front cover of the
control box. Install 3/4” conduit into the pre-punched holes in the back of the con-
trol box. Route power wires and connect to power block and grounding lug. Install
the service wires (L1, L2, and L3 (3 phase only)) to the appropriate terminals as
they are marked on the terminal block. Install the grounding wire into the lug pro-
vided. Tighten the connections. It is recommended that “DE-OX” or another similar
anti-oxidation agent be used on all power connections.
VOLTAGE CHECK:
Ensure that the power switch is in the OFF position and
apply power to the dishmachine. Check the incoming power at the terminal block and ensure it corresponds to the voltage list-
ed on the data plate. If not, contact a qualified service agency to examine the problem. Do not run the dishmachine if the volt-
age is too high or too low. Shut off the service breaker and mark it as being for the dishmachine. Advise all proper personnel
of any problems and of the location of the service breaker. Replace the control box cover and tighten down the screws.
Tempstar LT/NB/S/SDS Technical Manual 7610-011-86-35
Issued: 12-07-2007 Revised: N/A
SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS (CONTINUED)
10
Incoming Power Connection
Power Block
Ground Lug
Summary of Contents for TEMPSTAR
Page 2: ......
Page 9: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Page 16: ...8 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS ...
Page 22: ...14 SECTION 3 PREVENTATIVE MAINTENANCE ...
Page 24: ...16 SECTION 4 TROUBLESHOOTING SECTION ...
Page 27: ...19 SECTION 5 PARTS SECTION ...
Page 67: ...59 SECTION 6A ELECTRICAL SCHEMATICS FOR TOP MOUNT UNITS ...
Page 83: ...75 SECTION 6B ELECTRICAL SCHEMATICS FOR SIDE MOUNT UNITS ...
Page 93: ...85 SECTION 6C ELECTRICAL SCHEMATICS FOR OPTIONS ...
Page 96: ...88 SECTION 7 JACKSON MAINTENANCE REPAIR CENTERS ...
Page 103: ......