1 9
PERFORM WITH POWER SUPPLY DISCONNECTED
The blowers must take in clean air at room temperature (minimum 18°C.) so that the air heater functions properly and supplies air
into the bath at a pleasant temperature. The blowers must be installed in Zone 1 under the bath and only be accessible with a tool.
Install in an appropriate well-ventilated, flood-proof area.
Seal is supplied in notice packet
The air supply tube is factory-fitted to the air collector (photo1) and to the turbo unit (photo2) so you only need to connect it to the
blower. To do so, insert and tighten a quarter turn.
The next step is to connect the blower to the electric box. The blower cable has a watertight connector on the end. Simply screw
onto the female part located on the front of the electronic unit
to the turbo unit
3 pin
4 pin
to the air collector
seal
seal
Connecting the blowers
Electrical connections
Electrical connections (power supply) must be performed by a qualified electrician in compliance with local stan-
dards (NFC 1500 in France).
- The pump, blower, compressors, electronic boxes and
power cable (2 with aroma optional) must not be accessible
from the bath during use. Zone 1 under the bath should
only be accessed with a tool.
- The power supply cable must be permanently connected to a
fixed 230V/50 Hz, 16 A+ protective earth supply, as per local
standards. It must be protected by a differential circuit brea-
ker (maximum 30mA) installed outside Zones 0, 1, 2 and 3.
- Use power cable type 60227 IEC 53 or H05VV-F with two
cond protective earth supply 1.5mm2 and the IPX5
protection junction box supplied with the bath.
- This junction box should only be installed in Zone 1, under the
bath.
- I f p o w e r c a b l e i s d a m a g e d , i t s h o u l d o n l y b e r e p l a c e d b y t h e m a n u f a c t u r e r, an after-sales
department or a qualified professional.
- As per local standards (NFC 15100 in France) , an equipotential link made inside bathroom must connect all
conductive parts and components in Zones 1, 2 and 3 (metal bath, metal waste, taps, bath frame).
- Perform equipotential link via terminal marked with an “
”symbol located on the bath support frame.
Zone 1
Zone 2
Zone 0
Zone 1
Zone 1
Zone 2
Zone 2
=>2.25 m
=>2.25 m
Outside Zones
Outside Zones
Outside Zones
Outside Zones
LUXE