ENGLISH
4
Jacuzzi Whirlpool Bath
©
BR28000B 4/05
ALLUSION Installation
Note that the motor/pump protrudes beyond the bath rim a
maximum distance of 1/2" and the blower support does not ex-
tend beyond the bath rim at the opposite end. Care should be
used when lowering the tub into cutout to prevent injury to
installer(s), finished surfaces, or tub and components.
Clearance must be provided for installers. See page 2 for
recommended clearances surrounding tub. Damage to shell,
plumbing, wiring, lighting, fiberoptics, and other components
because of failure to observe minimum clearances are not
the responsibility of Jacuzzi Whirlpool Bath
©
.
All deck finish work must be completed before installation. Use the Cutout Template provided. Flooring surface inside
the cutout to deck height must not exceed height specification for tub.
Cover all finished surfaces to protect from damage during tub installation.
Turn OFF power supply to dedicated GFCI protected circuits.
Begin Installation
Using a washable marker scribe a reference line 1/2" outside the cutout edge
on the deck surface. This will assist in final alignment of the tub.
If the foam footing under the Blower support plate
does not have a relief cut or is not backset at least 2"
from the end of the blower support board, then cut one
now.
Install any trim kits, faucets, or other tub components
before installing.
To install unit insert the motor/pump end first when lowering the tub into the cutout opening as shown in the bottom illustra-
tion. Do not use plumbing fixtures or plumbing lines to lower unit. The clearance under the substrate is required for air flow
circulation requirements.
Place a piece of scrap lumber under each corner as a temporary support for the tub rim.
Inspect all fittings, plumbing, fiberoptic, air, and control lines after inserting to insure components
are not damaged, disconnected, or contacting the finish surface substrate or support members.
Connect flex water supply lines to faucet.
Plug power cords into GFCI outlets.
Remove fingers, hands, and all other items from under the rim edge before lowering the tub.
Slightly lift one tub end and remove the scrap lumber. Gently lower the tub rim until it contacts the
deck surface. Slightly lift the remaining tub end and remove the scrap lumber. Gently lower the
tub rim until it contacts the deck surface.
Using the reference lines align the tub over the cutout.
Connect drain line.
Turn ON the power supply to the dedicated GFCI protected circuits.
Check for leaks and check system operation.
(Blower)
(Motor)
(Heater)
MAXIMUM 1/2"
SUPPORT
MEMBER
SUBFLOOR
SUBSTRATE
MIN. 1-1/2"
CLEARANCE
TILE OR FINISHED
SURFACE
SUBSTRATE
FOAM FOOTING
TILE OR
FINISHED
SURFACE
SUPPORT
MEMBER
TUB
CUTOUT
1/2"
REFERENCE
LINE
FLOOR CUTOUT
FOR
DRAIN/OVERFLOW
SUPPORT
SUBFLOOR
SUBSTRATE
FINISHED SURFACE
SCRAP LUMBER
APPROX. 2-1/2"
2 " MAX
THICKNESS
FOAM FOOTING
BLOWER
30°
RELIEF CUT