Installation Instructions
Arga™ Bathtubs
Inspection and Testing
Visual Inspection
1
Remove the bathtub from the shipping carton. Be careful not to scratch the surface of the bathtub on exposed staples.
Remove the staples or fold them into the carton. Retain the carton until satisfactory inspection of the product has been made.
Do not lift the bathtub by the plumbing at any time; handle by the shell only.
2
Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the finish or visible damage to
any components, do not install the bathtub. Damage or defect to the finish claimed after the bathtub is installed is excluded
from the warranty. Jacuzzi Luxury Bath’s responsibility for shipping damage ceases upon delivery of the products in good
order to the carrier.
3
Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer to the published
warranty information packed with the product.
All bathtub units are factory tested for proper operation and watertight connections prior to shipping. However, the unit must be
retested by the installer prior to installation. Jacuzzi Luxury Bath is not responsible for any defect that could have been discovered,
repaired, or avoided by following this inspection and testing procedure:
1
Remove bathtub from skirt and place on a level surface, near appropriate water supply, and water drainage. A driveway is a
suitable choice.
2
Seal the drain and overflow hole with tape or a stopper and fill the bathtub to the bottom of the overflow hole.
3
Allow bathtub to stand for 5 minutes. Use operating instructions to ensure tub functions as described. Do not install if tub does
not function properly.
4
Visually inspect all joints for leaks. Do not install the bathtub if leaks are detected.
5
Return bathtub to box or otherwise protect from damage until time of installation.
Bathtub Water and Operational Test
Prepare the sub floor for the drain and ensure that the area is level.
1
The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical Specifications
section that corresponds with your bathtub (available on www.jacuzzi.com).
2
Determine the location of the basin. The floor must be flat and level.
3
Make appropriate cuts to the Sub floor to accommodate the drain.
Please refer to the drawing(s) in the Technical Specifications section that correspond to your bathtub.
Sub Floor Preparation
Using the supplied template, cut a 5” hole in the sub
floor.
Install the drain alignment kit into the sub floor
according to the included instructions.
NOTE:
Use included template to plan for placement of drain and electrical connection location for required 15A GFCI
protected outlet.
1
Preparing the Floor for MZ20000 Drain Alignment Kit
2
Fig. 1