Step 2
X
X
Using a pencil, lightly outline each support leg. Remove the bathtub
(Figure 20).
X
Y
Use a tape measure to determine the center of the square outline.
Mark this location. Repeat this step for the remaining three support
legs.
X
Z
Use a tape measure to verify the following measurements:
Large Frame - 26 ⅞" (W) x 39" (L)
Small Frame - 24 ⅜" (W) x 33" (L)
Step 3
Figure 20.
Marking the Location
Center
Point
X
X
At each marked location, drill a " hole 1½" in depth (Figure 21).
Repeat this step for the remaining locations.
X
Y
When complete, clean the drilled hole of all debris.
716
Figure 21.
Drilling the Mounting Hole
1½"
Step 4
X
X
Insert the wedge anchor into the drilled hole. If necessary, use a
hammer and gently tap the wedge anchor into place (Figure 22).
X
Y
Use a wrench to tighten the nut. Do not overtighten this nut. Tighten
the nut until it is firmly secured.
X
Z
Repeat the previous two steps for the remaining locations.
Figure 22.
Wedge Anchor Installation
Wedge
Anchor
Nut
Outline
" Drill Bit
716
39"
33"
6"
Drain
Water Supply
6"
Drain
Water Supply
X
X
Center the bathtub with the drain line that is located
on the floor.
X
Y
Measure 6" from the center of the water supply line
to the center of the bathtub drain opening
(Figure 19).
These measurements will remain the same if you
decide to install the bathtub length-wise.
It is strongly recommended that two people perform
the following steps.
Figure 19
. Securing the Bathtub
Step 1
26⅞"
24⅜"
Securing the Unit