Use of a level will be needed to verify that the bathtub is level. If the
bathtub is not level, please perform the following steps.
To lower and raise the height of the bathtub (Figure 24):
X
X
Locate the leveling foot (2 total; one under each support block).
X
Y
Adjust the bathtub to the desired height and levelness.
X
Z
Retighten the height adjustment bolts.
X
[
Proceed to the "Plumbing Installation: Double Ended" section.
Once the bath tub has been secured, all finish plumbing must be installed.
Please refer to the installation instructions that are included in the
packaging.
When complete, please proceed to the "Leak Test" section.
Figure 24.
Level Adjustment
Up
Down
Step 1
Pedestal
X
X
Attach the four (4) pedestal legs to the bottom of the bathtub
(Figure 25).
X
Y
Fingertighten at this time.
X
Z
When complete place the unit on the packaging, or a blanket, off to
the side of the installation area.
It is strongly recommended that two people perform the following
steps.
Bathtub
Pedestal
Stand Off
Flat Washer
Figure 25.
Pedestal Leg Attachment
Nuts
Step 5
X
X
Place the unit over each secured wedge anchor.
X
Y
Once the holes are lined up with the wedge anchors, gently lower
the unit down (Figure 23).
X
Z
Firmly press the unit onto the wedge anchors to finish the
installation.
Figure 23.
Wood Frame Placement
It is strongly recommended that two people perform the following
steps.
Wood Frame
Wedge
Anchor
Wood Frame
Wedge
Anchor