32
hose draining (areas at risk from ice)
Spa-pak “booster kit” (optional)
33
Water connections
The plumbing system (including connectors, gate valves, etc.,
2-
2a
) for connecting the Hot tub to the Spa-Pak and the balance tank,
must be set up by the installer.
The Customer must provide the ground drainage points (
2-2a,
detail 27 and 28
) of suitable dimensions, which can be inspected for
any cleaning, and to which the low-point drain ø 50 mm (
2-2a,
detail 3
), the loading/overflow of the balance tank and the drain from
the filter are to be connected.
Spa-pak “booster kit”:
in the instance where a spa-pak “boost-
er kit” is also installed, it must be connected to the drainage sys-
tem; refer to the relative documentation.
CAUTION! Before preparing the ground drainage points,
consult the local authority for the regulations that control
the drainage of chemically treated water.
In particularly cold areas, to avoid the risk of any remaining water
freezing
(water that may remain in plumbing after emptying the sys-
tem)
it is advisable to install valves for the complete drainage of plumb-
ing (
2-2a, detail 31
).
To fill the spa, you can use a garden hose, or provide connections to the
plumbing system of the home as shown in
2-2a, detail 11
.
IMPORTANT: the 3/4” solenoid valve on the balance tank (for
automatic filling of water level) must always be connected to
the water system that supplies the system.
Any connections to the drinking water system (other than the
recommended ones) must be carried out according to EN1717
regulations, using “AA”, “AB” or “AD” anti-pollution protection
procedures. For further information, we recommend you con-
tact your water supply company and/or your plumber.
If included, connection of the blower (
2-2a, detail 17
) to the spa
must be made by creating a siphon (
2-2a and 6, detail B
) as near
as possible to the spa itself. This will prevent situations where the water
might reach the blower and compromise its operation.
Electrical connections
For preparations/measuring the electric system that will supply the
spa, please note that powers in kW indicated in the “
Maximum
Absorption of the System
” table are to be considered as maximum
absorbed powers during operation.
Spa-pak “booster kit”:
in the instance where a spa-pak “boost-
er kit” is also installed, a separate supply line must be provided
and it must be connected to the main spa-pak; refer to the rela-
tive documentation.
SINGLE-PHASE TOP
(
3
).
■
The electrical connection can be made as follows:
- single-phase line (220-240V 1~)
- three-phase line consisting of two phase cond
neutral conductor (380-415V 2N~)
- three-phase line consisting of three phase cond
neutral conductor (380-415V 3N~)
■
The rated power supply voltage of the equipment is
always 220-240V.
■
The equipment can also be installed in Countries
where the 220-240V voltage is supplied by a two-pha-
se system. For the connection please refer to the in-
struction manual.
The installer must in any case use properly protected cables with
a suitable cross-section (see the
minimum cross-section
tables),
with characteristics not inferior to type H 05 VV-F (multipolar).
• SINGLE-PHASE TOP VERSION
THREE-PHASE
(
4
).
The installer must use cables with a suitable cross-section (see
the
minimum cross-section
tables) protected with a sheath of Ø
32 mm at the terminal in question and/or tubes or pipes when car-
rying out connection to the main switch with characteristics not
inferior to type H05VV-F
(multipolar)
or H07 V-K
(unipolar)
.
• THREE-PHASE VERSION
NOTE: The lead sections must take account not only the systems
absorption but also the cable path and the distances, the chosen
protection systems and the specific regulations for fixed electrical
systems in force in the country where the spa is installed.
Remember that it is compulsory to install a multiple-pole section
switch with characteristics that are no less than the ones given in the
“Electrical Safety” chapter and
3-4
, taking into account the maxi-
mum absorption of the system.
The installer must comply with the above regulations,
and also use
watertight connectors at connection points. He must also guar-
antee compliance with the specific current standards for sys-
tems in the country in which the spa is installed.
Compliance with this regulation is obligatory: any other procedure is
prohibited.
with
heater
(3
kW
)
with
heat exchanger
4 mm
2
4 mm
2
4 mm
2
2,5 mm
2
2,5 mm
2
2,5 mm
2
220 - 240 1N~
380 - 415 3N~
without
heater
with
heater
(12
kW
)
with
heat exchanger
10 mm
2
2,5 mm
2
2,5 mm
2
4 mm
2
1,5 mm
2
1,5 mm
2
(*): special standard (not valid for Europe)
220 - 240 3~
(*)
380 - 415 3N~
without
heater
17
Summary of Contents for Experience ALIMIA
Page 2: ...Italiano 12 English 16 Fran ais 20 Deutsch 24 Espa ol 29 33...
Page 10: ...10 4 4 1 3 2 5 6 2 3 4 c m A A A A A A 5...
Page 38: ......
Page 39: ......