J-200 Series
GRN
WHT
WHT
BLK
BLK
BLK
RED
1
2
3
Figure-C
TB1
to Circuit
Board
Power In
GRN
WHT
WHT
BLK
BLK
BLK
RED
RED
RED
1
2
3
Figure-D
TB1
to Circuit
Board
Power In
Move Red
Wire Here
north american Convertible
models:
120/240 VAC, 3-Wire
Connection 60 Hz
north american Convertible
models:
120/240 VAC, 4-Wire
Connection 60 Hz
CauTIon (For 4-wire 240 vaC Heater operation): move the
red wire on the main terminal strip (TB1) from position #1 to
position #3. make certain wires are connected exactly as shown
in Figure-D before applying power. Failure to do so will result in
damage to the circuit board and/or related components and void
the manufacturer’s warranty.
BLK
RED
RED
RED
BLK
BLK
1
2
Figure-E
TB1
to Circuit
Board
Power In
Green
TB3
1
2
BLUE
BLUE
BROWN
BROWN
Figure-F
TB1
to Circuit
Board
Power In
Green
TB3
north american 240v models:
240 VAC, 3-Wire Connection 60 Hz
all export models:
230 VAC, 3-Wire
Connection 50 Hz
Congratulations!
You are now all set to get your new spa ready to use.
Simply follow the step-by-step procedure in Section 8.0, before long,
you will be enjoying your first glorious experience in your Jacuzzi J-200
Series spa.
18