32
Periodically, however, the differential switch (see
“ELECTRICAL SAFETY” chapter) of the system to which the mini-
pool is connected must be checked for efficiency.
When you
press the TEST key, the switch must disconnect. If this does
not happen, disconnect the power supply immediately and
contact a qualified technician.
For any extra maintenance and/or repairs it is recommended
that you contact an Authorized Service Centre and use only o-
riginal spare parts.
Set up for installation
The customer must make provisions for a ground drainage
point of suitable dimensions and that can be inspected for any
cleaning that may be required.
ATTENTION: Before preparing the ground drainage
point, consult the local authority for the regulations
that control the drainage of chemically treated water.
J-200
The spa water drain is located behind the front panel, to the
right (or left), dependent on the electric box. The pipe must be
placed in the drain basin when carrying out periodic emptying.
1-1a-1b-1c, part.A
.
The pipe must be placed in the drain basin when carrying out
periodic emptying.
J-300/J-LXL/J-400/J-500
Premium spas are equipped with the drain arranged as in
2-2a-2b-2c-2d-2e-2f-2g-2h, 3-3a-3b-3c, , 4-4a part.A
.
For periodic emptying of the spa you can connect a rubber
hose to the drain valve (
2-2a-2b-2c-2d-2e-2f-2g-2h, 3-3a-
3b-3c, 4-4a part.A
).
NOTE:
To open the valve, turn the ring nut counter-clockwise and
pull.
If you decide to attach the spa to the drain, it is advisable to con-
nect upstream from the valve (for greater flow capacity) and to
install a shutter valve near the drain in an accessible area
(
2-
2a-2b-2c-2d-2e-2f-2g-2h, 3-3a-3b-3c, 4-4a part.A1.
J-400/J-500
The Quick Drain™ (
3-3a-3b-3c, 4-4a part.C)
may be con-
nected to the drain pit.
According to the type of installation chosen the ground
drainage point will then be put into position. The Premium spas
can be installed in a variety of ways:
-
Free standing
on the floor or on a specifically prepared base
(
10
).
-
Semi-built in
, so that only the base of the spa is built-in and
therefore the side cover panels remain free (
11
). In this case,
it is appropriate to prepare some removable under-frames (in
marine plywood, etc.) that, besides aesthetically completing in-
stallation, allow the panels to be removed more easily.
In any case you will need to provide a support base that is
suitable for the selected model, taking into consideration the
data contained in the table "Weights".
In the case of intermediate flooring, terraces, roofs or
other similar structures, consult a building engineer.
(
8
)
The support base must be flat and level in or-
der to provide uniform support for the weight of the
spa. Otherwise the front panels and/or methacrylate
shell could be damaged: this damage is not covered
by the warranty.
You can use a garden hose to fill the spa.
If the spa is connected, for periodic filling, to the
mains system that supplies drinking water, this con-
nection must be carried out in compliance with the
EN1717 norm, using “AA”, “AB” or “AD” anti-pollution
protection procedures. For further information, we
recommend you contact your water supply company
and/or your plumber.
For indoor installation, it is necessary to remember that
water evaporation from the spa (especially where high temper-
atures are involved) can cause very high levels of humidity.
Natural or forced ventilation helps to maintain personal com-
fort and reduce damage to the building due to humidity.
Jacuzzi Europe refuses all responsibility for any damage caused by
excessive humidity or by overflowing water. Consult a specialist
for indoor installation.
Remember that it is compulsory to install a multiple-pole
section switch with characteristics that are not less than the
ones given in the chapter “Electrical safety” and
5-6-7
.
The installer must use cables with an adequate cross-section,
protected by a sheath and/or with tubes or ducts, with charac-
teristics not inferior to type H 05 VV-F.
The entry of cables into the mini-pool up to the electrical box
(
5-6-7
) must be provided at point
B
or
B1
, depending on
the customer's installation needs.
Note: The lead sections must take account not only the sys-
tems absorption but also the cable path and the distances,
the chosen protection systems and the specific regulations
for fixed electrical systems in force in the country where
the spa is installed.
The installer must comply with the above regulations,
and
also use watertight connectors at connection points. He
must also guarantee compliance with the specific current
standards for systems in the country in which the spa is
installed.
It is mandatory to comply with this instruction. Any other proce-
dure is prohibited.
Summary of Contents for J-300 Series
Page 3: ...3 B A 1 9 8 Ø 198 76 15 91 B Z A Z 1 J 210 A cm ...
Page 4: ...4 R 19 A 213 213 Z 91 B 82 9 B1 213 x 213 Z 1a J 235 A cm ...
Page 5: ...5 R 19 213 213 Z A 91 213 x 213 82 9 B Z B1 1b J 245 A cm ...
Page 6: ...6 R 19 229 229 Z A 91 B B1 229 x 229 82 9 Z J 275 A 1c cm ...
Page 7: ...100 625 625 193 168 R 28 B Z 193 x 168 81 66 15 B1 A Z J 315 7 cm 4 1 2 3 A A1 2 ...
Page 8: ...8 100 625 625 86 193 x 213 A B B1 71 15 R 28 213 193 Z Z J 325 cm 4 1 2 3 A A1 2a ...
Page 9: ...9 100 213 213 R 28 91 B1 76 15 213 x 213 Z A B Z J 335 4 1 2 3 A A1 cm 2b ...
Page 10: ...100 213 213 R 28 91 213 x 213 B1 76 15 Z A B Z J 345 10 cm 4 1 2 3 A A1 2c ...
Page 11: ...R 28 231 213 Z A B1 96 B 81 15 231 x 213 Z J 355 11 cm 4 1 2 3 A A1 2d ...
Page 12: ...100 231 213 R 28 B1 A B 96 231 x 213 81 15 Z Z 12 J 365 cm 4 1 2 3 A A1 2e ...
Page 13: ...13 231 231 Z B1 B R 28 A 96 231 x 231 81 15 Z J 375 cm 4 1 2 3 A A1 2f ...
Page 14: ...231 R 28 231 Z A 96 B 231 x 231 81 15 B1 Z 14 J 385 cm 4 1 2 3 A A1 2g ...
Page 15: ...1 _ 2 Flow 214 214 214 x 214 86 6 92 A Z B B1 Z J LXL 15 cm 4 1 2 3 A A1 2h A ...
Page 25: ...25 9 WARNING DONOT LOOK AT LIT BULB SEVERE EYE DAMAGE OR BLINDNESS CAN OCCUR OK 8 ...
Page 26: ...10 11 26 ...
Page 27: ......
Page 46: ......
Page 47: ......