Page 57
J-400 Series
Red (L2)
Pigtail
Neutral Bus
Ground
TB2
TB1
Black (L1)
Green
Main
Service
Panel
with
GFCI
2-Pole
GFCI
Breaker
Ground/Bonding Lug**
2-Pole Circuit Breaker with 2-Wire Grounded Load Connection
(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)
White (N)
Black (L1)
Red (L2)
240 VAC
No Load Neutral Wire
Note: service disconnect not
shown in this diagram.
The control box TB1 terminal
position varies between models.
B
R
Red (L2)
Red (L2)
Pigtail
Neutral Bus
Ground
TB2
Black (L1)
Black (L1)
Green
GFCI Sub Panel*
Main Panel*
2-Pole
GFCI
Breaker
Ground/Bonding Lug**
No Load Neutral Wire
Main Panel with Secondary GFCI Shut-Off Box Using a
2-Pole GFCI Breaker with 2-Wire Grounded Connection
(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)
TB1
White (N)
Green (Ground)
*GFCI Sub Panel commonly
used when recommended GFCI
does not install in Main Panel.
Note: service disconnect not
shown in this diagram.
The control box TB1 terminal
position varies between models.
B
R
B
A
240 VAC
19.0 Typical spa wiring Diagrams a-B
(north american 60Hz models Only)
DANGER
Turn power off
before servicing. This
task should only be
performed by a quali-
fied technician.
!
RISK OF SHOCK OR
ELECTROCUTION!