Page 63
J-400 Series
6. Once back to the “Program B” Main
Menu, press the Down button on the
Quad keypad to highlight “Start
Time” (Figure K). Press the Left or
Right button on the Quad Keypad to
select the time you wish the spa to
run. Press the Down button on
keypad to save setting.
note:
If you are using a standard 12-hour period, you will see
the hour displayed as “1PM”. For the 24-hour period it will read “1300”.
7.
Now you will need to adjust the
“Duration” (Figure N) of the cycle.
The duration range is from 0 (OFF)
to 6 hours. Press the Left or Right
button on the Quad Keypad to make
your adjustment(s) in increments of 1
hour.
note:
The default “Duration” is OFF.
8. Press the Splash button on the Quad Keypad to get back to the
Heating Menu.
9.
Press button D to exit the Heating
Menu and return to the Settings 2
Main Menu. If you have
programmed both heating cycles
and the settings have been
accepted, you will see the two
program icons next to word Heating
on the display (Figure O). If only
one cycle was programmed, there will only be one icon. If
no cycles were programmed there would be a thermometer with
wavy arrows as the icon.
13.4 Clean-up “blow-out” Cycle
The clean-up cycle is once per day in both Auto-Heating and
Programmable modes at 12:00 (noon) for two minutes. This is not user
programmable. Each jets pump activates for one minute to circulate any
water in the plumbing unless a
pump has just finished a 20 minute time
out, it will not automatically activate for the clean-up cycle. Be aware, the
factory programmed clean-up cycle cannot be canceled or altered!
PROGRAM B
Start Time
Day Settings
Duration
Select
B
Start Time
Press to save
1AM
Figure K
PROGRAM B
Start Time
Day Settings
Duration
Select
B
Press to enter
Duration
OFF
Figure N
Primary
Secondary
Heating
Press to
reset to default
SETTINGS 2
OFF
A
B
Figure O