J-Dream Owner’s Manual
Rough-in Niche (Left Hand)
16"
FINISHED
WALLS
2" WASTE
STUBOUT
FINISHED
WALL
SURFACE
FINISHED
FLOOR
MATERIAL
60"
FINISHED
MINIMUM
FINISHED
WALL
SURFACE
36"
3"
3"
13"
WASHING MACHINE
OUTLET BOX
Connect #8 guage (10mm
2
) minimum solid copper bond
wire to house electrical panel or approved local ground.
An approved ground may be an 8 foot long ground rod
(3 meter long earth rod), a plate electrode, or other
acceptable bond. Check your local building code for
reqiurements.
Electrical outlet 240V, 15A
rating to be on a GFCI-
protected circuit.
HOSE BIBB (2)
TWO (2) 1/2 " HOT & COLD
WATER SUPPLY LINES
IMPORTANT: This illustration shows the
installed position of the waste stubout when
connected to the shower drain. If the stubout
is installed before the shower unit, leave enough
flex in the waste line to allow the end of the
stubout to be blocked temporarily (see page 14)
in a position under flush to the floor surface.
This will allow the shower unit to slide across
the floor into position without having to lift it.
IMPORTANT: The shower drain is designed
to connect to a 2 inch (50 mm) ABS or PVC (as
approved by local codes/standards) waste
stubout.
End of 2 inch (50 mm) waste stubout must
be located to these dimensions within 1/4
inch (6 mm).
Stubout for steam tank drain down
line should be minimum 1/2"
copper tubing. Provide 3/4" male
pipe thread fitting on end of copper
drain line.
This drain line must be provided for
the steam tank drain to site drain
as required by local
codes/standards.
40"
55"
18"
16-3/8"
8