J-Dream Owner’s Manual
Base and Drain
Important: Locate base to provide assembly access to all sides
Remove base from carton labeled Base/Top. Place clear top in carton to prevent damage. The clear top will not be installed
until the unit has been fully assembled and plumbed.
Position the J-Dream base on the floor so that you have work access to all four sides of the unit during assembly. Allow a
minimum of 24" (600 mm) for access on each side of base. Before starting assembly, position the base pointing in the same
direction as it will be in the final installation position, so no unnecessary turning of the unit is required.
Notice Base is positioned in the
same direction as it will be in the
final installation position. (Right
hand model shown.)
Base
Floor cut-out
for drain pipe.
Drain Fitting
Niche where J-Dream
is to be finally installed.
Floor cut-out
for steam tank
drain pipe.
10