48
Red
Red (Hot)
Pigtail
Neutral Bus
Ground
TB2
TB1
Black
Black (Hot)
White
Green
GFCI Sub Panel*
Main Panel*
Hot Tub Load Box
2-Pole
GFCI
Breaker
Ground
Main Panel with Secondary GFCI Shut-Off Box Using a
2-Pole GFCI Breaker with 3-Wire Grounded Connection
(4 Wires to Hot Tub, 2-Hot, 1-Neutral, 1-Ground)
D
Red
Red (Hot)
Pigtail
Neutral Bus
Ground
TB2
Black
Black (Hot)
Green
GFCI Sub Panel*
Main Panel*
Hot Tub Load Box
2-Pole
GFCI
Breaker
Ground
No Load Neutral Wire
Main Panel with Secondary GFCI Shut-Off Box Using a
2-Pole GFCI Breaker with 2-Wire Grounded Connection
(3 Wires to Hot Tub, 2-Hot, 1-Ground)
C
TB1
White (Neutral)
Green (Ground)
White (Neutral)
Green (Ground)
Load Neutral Lug on Breaker
*GFCI Sub Panel commonly
used when recommended GFCI
does not install in Main Panel.
*GFCI Sub Panel commonly
used when recommended GFCI
does not install in Main Panel.
Note: service disconnect not
shown in this diagram.
Note: service disconnect not
shown in this diagram.
W B R
B
R
Summary of Contents for LCD Series
Page 40: ...36 APPENDIX ...