8
read the folloWing instrUCtions throUgh-
oUt Before starting the installation
important
Check the tub upon reception throughout (specifically, check for
visible damage to the exterior packaging). Notify the carrier if
damage is found, in accordance with the laws in force.
CheCK that the arrangeMents are sUited to the
indiCations shoWn on the pre-installation Card.
Wearing protective gloves, remove the tub from the package. Lift
it from the rim only.
never
lift the tub by grasping the pipes.
remove the protective film and check for faults. Warranty for
damage caused by shocks and scratches will be void after
installation.
Check the fastening of all clamps (rubber couplings and air
line tubes).
The installation of the whirlpool baths must be made on finished
(tiled) walls and floor. Apply silicone between the tub rim and the
wall.
The panels allow access to the electromechanical components under
the tub and ensure appropriate ventilation also for hydromassage air-
water mixing functions
.
ventilation must be ensured also if Jacuzzi® panels are not
used (see pre-installation card). the panels must be stably
fixed and a specific tool must be used to remove them.
ventilation openings, holes, and grids must not allow the
introduction of objects of diameter larger than 12 mm.
preliMinarY operations
(
1
) Position the tub in the installation place, level it and
adjust height by turning the feet (A) in the corners of the tub by
hand.
note:
The feet allow adjustments in the range from -0.5 to +1.5 cm
to compensate for differences in the floor level.
do not loosen the loCK nUts (g) on the
fraMeWorK shoWn BY a laBel With a red arroW
(
2).
(
2
) Mark the hole for each external foot on the floor (one
hole is enough).
Move the tub and drill the floor.
Insert screw anchors (B), rearrange the tub in the chosen position
and check that the central feet (A1) rest on the floor (
1
).
fitting the taps
(where applicable)
Retrieve the accessory kit box containing the various tap
components and assembly instructions.
note: fit the tap on the tub away from the installation area
and however before fixing it to the floor.
fiXing the tUB
Before fixing the tub to the floor, fill it with water.
Leave the tub filled for at least one hour and check for leakage.
(
2
) Empty the tub and permanently fix the feet with the
screws (C) to the floor; check that the central feet (A1) rest on the
floor well (
1
).
eleCtriC ConneCtion
(Refer also to the “Electric safety” chapter in the WIRING DIAGRAM
manual)
Connect the electric box and the power line respecting the
symbols
“l”
- phase, “
n”
-neutral and
- ground: remove the
lid from the box, establish the connections, and close the lid
carefully. Secure the cable clamp well to ensure protection from
jets of water.
IMPORTANT: for Countries where 220-240V voltage
is supplied by a two-phase system (L+L), the connec-
tion has to be made on terminals L and N anyway.
Power the tub by operating the upstream master switch (see
“Electric safety” chapter in the WIRING DIAGRAMS manual).
refer to the “electric safety” chapter for information on
wires, the multiple-pole isolation switch and the electric
connection.
CheCKs
run a hydromassage cycle, checking once again that there
are no leakages, paying particular attention to water
connections and the drain.
aCCessories
Apply silicone carefully around the entire rim in the resting
point on the wall. On applicable models, Jacuzzi® finishing profiles
(optional) are recommended for a perfect finish.
note:
It is advisable to apply silicone after fitting the panels.