background image

2

Turn off water at main supply.

CAUTION

INSTALL TRIM

2a

INSTALL HANDLE (ADJUST HOT LIMIT STOP 

PRIOR TO HANDLE INSTALLATION, 

SEE STEP 3)

Lever Handles: 

Thread HANDLE BASE (4) onto

threads of CAP (1) until seated against it's internal
stop. Install FRICTION WASHER (14) onto base 
of LEVER HANDLE (12). Align LEVER HANDLE (12) 
and tighten set screw with HEX WRENCH (13) 
supplied with faucet to secure handle.  

For Cross Handle: 

Thread HANDLE BASE (8) onto 

threads of CAP (1) until seated against it's internal 
stop. With VALVE in off position align CROSS 
HANDLE (9) as desired. Install CROSS HANDLE (9) 
onto VALVE STEM (15) and tighten HANDLE 
SCREW (10). Thread INDEX (11) into 
CROSS HANDLE (9). 

CROSS HANDLE

LEVER HANDLES

8

10

9

11

4

12

13

1 0 9 4 9 2 A

1/2" NPT

FINISHED WALL

BOTTOM OF

TUB

OR SHOWER

STALL

48" TO 54"
OPTIONAL

OPTIONAL TO

FINISHED FLOOR 

USUALLY BETWEEN

72'' AND 84"

"SEE ILLUSTRATION"

1-5/8" TO 3-1/4"

To assure proper positioning in relation to wall,
note roughing-in dimensions. 

ROUGHING-IN DIMENSIONS

7-7/8"

SHW

TUB

1

ROUGHING-IN

Turn off water at main supply.

CAUTION

            When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK
STOPS (IF PRESENT). When finished soldering, flush valve body, replace
cartridges, check stops (if present) and plaster guard to continue installation.
Use thread sealant or Teflon tape on threaded connections.

NOTE

If the valve is installed on a fiberglass or
other thin wall application, the PLASTER
GUARD (4) can be used as a support.

Connect hot and cold water supplies.
Cap off shower pipe (5). 
For support, use pipe BRACES (6) secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.

COLD

HOT

PLUG

Cut a 4" dia. hole in the shower stall.
Drill two additional 1" holes to allow
access to the stops.
Remove PLASTER GUARD (4), rotate
180˚ so that indicated screw holes fit
MANIFOLD (2). Push CAP on valve, place
ESCUTCHEON on and attach with screws.

1

6

5

3

4

2

See Roughing-in diagram before starting.
Connections are:
   1/2" female NPT for threaded inlets
Connect RISER PIPE (1) to MANIFOLD (2)
top outlet marked "SHR".
Plug TUB outlet with 1/2" NPT PLUG supplied.
For proper positioning the finished wall
must be within side wall of PLASTER
GUARD (4).

THREADED INLETS (STOPS)

OUTLETS 1/2" NPT

INLETS 1/2" NPT

5-7/8"

3-3/8"

1/2" PLUG

Plumbers' Putty or Caulking

Adjustable Wrench

Teflon Tape

Phillips Screwdriver

Channel Locks

TOOLS REQUIRED

Tubing Cutter

Regular Screwdriver

By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the
HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1).

1

51

31

19

75

31

0

1

5

1

3

1

1

9

7

5

3

1

1

5

1

3

1

1

9

7

5

3

1

3

COLDER

(Larger Numbers)

0 1 3 5 7 9 11 13 15

HOTTER

(Smaller Numbers)

0 1 3 5 7 9 11 13 15

Remove Handle Assembly and Trim. See above step 2 for reference.

Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT
LIMIT STOP (1). Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1). Pull
forward and rotate counterclockwise one number to limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4) and NUMBERS (5) on HOT LIMIT STOP (1)
for indication.

1

5

1

5

4

4

3

3

2

2

ADJUST HOT LIMIT STOP (MUST BE DONE PRIOR TO TRIM INSTALLATION)

1 0 9 4 9 2 A

14

THREADS 

ON CAP

1

15

7

3

5

6

Push CAP (1) onto VALVE CARTRIDGE (2). Secure CAP (1) to
VALVE CARTRIDGE (2) with SCREW (3) for LEVER HANDLE only. 
(Spline in CAP (1) must fully engage spline on cartridge stem). 

Push the COVER (7) as shown over the CAP (1) and align 
prongs on COVER (7) with screw holes in ESCUTCHEON (5).
Important! Make sure COVER (7) snaps over the SCREWS (6).

Mount  ESCUTCHEON (5) with gasket to valve body and secure 
with SCREWS (6).

2

Reviews: