2
Turn off water at main supply.
CAUTION
INSTALL TRIM
2a
INSTALL HANDLE (ADJUST HOT LIMIT STOP
PRIOR TO HANDLE INSTALLATION,
SEE STEP 3)
Lever Handles:
Thread HANDLE BASE (4) onto
threads of CAP (1) until seated against it's internal
stop. Install FRICTION WASHER (14) onto base
of LEVER HANDLE (12). Align LEVER HANDLE (12)
and tighten set screw with HEX WRENCH (13)
supplied with faucet to secure handle.
For Cross Handle:
Thread HANDLE BASE (8) onto
threads of CAP (1) until seated against it's internal
stop. With VALVE in off position align CROSS
HANDLE (9) as desired. Install CROSS HANDLE (9)
onto VALVE STEM (15) and tighten HANDLE
SCREW (10). Thread INDEX (11) into
CROSS HANDLE (9).
CROSS HANDLE
LEVER HANDLES
8
10
9
11
4
12
13
1 0 9 4 9 2 A
1/2" NPT
FINISHED WALL
BOTTOM OF
TUB
OR SHOWER
STALL
48" TO 54"
OPTIONAL
OPTIONAL TO
FINISHED FLOOR
USUALLY BETWEEN
72'' AND 84"
"SEE ILLUSTRATION"
1-5/8" TO 3-1/4"
To assure proper positioning in relation to wall,
note roughing-in dimensions.
ROUGHING-IN DIMENSIONS
7-7/8"
SHW
TUB
1
ROUGHING-IN
Turn off water at main supply.
CAUTION
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK
STOPS (IF PRESENT). When finished soldering, flush valve body, replace
cartridges, check stops (if present) and plaster guard to continue installation.
Use thread sealant or Teflon tape on threaded connections.
NOTE
If the valve is installed on a fiberglass or
other thin wall application, the PLASTER
GUARD (4) can be used as a support.
Connect hot and cold water supplies.
Cap off shower pipe (5).
For support, use pipe BRACES (6) secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.
COLD
HOT
PLUG
Cut a 4" dia. hole in the shower stall.
Drill two additional 1" holes to allow
access to the stops.
Remove PLASTER GUARD (4), rotate
180˚ so that indicated screw holes fit
MANIFOLD (2). Push CAP on valve, place
ESCUTCHEON on and attach with screws.
1
6
5
3
4
2
See Roughing-in diagram before starting.
Connections are:
1/2" female NPT for threaded inlets
Connect RISER PIPE (1) to MANIFOLD (2)
top outlet marked "SHR".
Plug TUB outlet with 1/2" NPT PLUG supplied.
For proper positioning the finished wall
must be within side wall of PLASTER
GUARD (4).
THREADED INLETS (STOPS)
OUTLETS 1/2" NPT
INLETS 1/2" NPT
5-7/8"
3-3/8"
1/2" PLUG
Plumbers' Putty or Caulking
Adjustable Wrench
Teflon Tape
Phillips Screwdriver
Channel Locks
TOOLS REQUIRED
Tubing Cutter
Regular Screwdriver
By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the
HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1).
1
51
31
19
75
31
0
1
5
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
3
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
Remove Handle Assembly and Trim. See above step 2 for reference.
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT
LIMIT STOP (1). Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1). Pull
forward and rotate counterclockwise one number to limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4) and NUMBERS (5) on HOT LIMIT STOP (1)
for indication.
1
5
1
5
4
4
3
3
2
2
ADJUST HOT LIMIT STOP (MUST BE DONE PRIOR TO TRIM INSTALLATION)
1 0 9 4 9 2 A
14
THREADS
ON CAP
1
15
7
3
5
6
Push CAP (1) onto VALVE CARTRIDGE (2). Secure CAP (1) to
VALVE CARTRIDGE (2) with SCREW (3) for LEVER HANDLE only.
(Spline in CAP (1) must fully engage spline on cartridge stem).
Push the COVER (7) as shown over the CAP (1) and align
prongs on COVER (7) with screw holes in ESCUTCHEON (5).
Important! Make sure COVER (7) snaps over the SCREWS (6).
Mount ESCUTCHEON (5) with gasket to valve body and secure
with SCREWS (6).
2