PRE-COMMISSIONING CHECK
Whenever you want to call a Service Engineer for commissioning, kindly
ensure that --
Ø
Installation work has been completed (i.e. foundation, earthing,
exhaust pipe job has been completed with proper supports, if extended
beyond the canopy)
Ø
Fuel pipe line job is completed, if Fuel Tank is outside the canopy.
Ø
If DG set installed inside a room, a duct to be provide for fresh air & hot
air exit should be 1.5 times higher then the canopy inlet & outlet.
Ø
Power cable laying, fitting and connection jobs are completed with
proper glanding.
Ø
If panel is out side canopy, Power Cable Control cable laying, fitting &
connection jobs have been completed.
Ø
Most important - Battery is charged.
Ø
If the DG set is with AMF Panel, then 230 V AC mains or 415 V AC mains
(R,Y,B,N) supply is provided at the AMF Panel to check its operation
and for Battery Charger.
Ø
Diesel is available in the Diesel Tank.
Ø
Engine is duly filled with Lube Oil upto "H" mark
Ø
Coolant level is up to ‘H’ mark
Ø
Load is available.
Note: It is mandatory to get your Diesel Generating Sets commissioned on load
and kindly do sign the commissioning report made by our Service Engineer.
13
JAKSON & CO.
Summary of Contents for JakPower Kirloskar Koel Green 2R1040 G1
Page 1: ......
Page 2: ......
Page 30: ...26 JAKSON CO BY KIRLOSKAR POWER JAKSON COMPANY 550 13 ...
Page 31: ...27 JAKSON CO BY KIRLOSKAR POWER JAKSON COMPANY 550 13 ...
Page 35: ...POWER JAKSON CO ...
Page 36: ......