8
5.
UPS Operation
(
1
)
Prepare before for turn-on
For normal running be able to the UPS. Please validation below thing before for turn-on,
refer to Fig2.
a.
Validation be located “OFF” for all power switch.
b.
Again validation primary for installation places.
c.
Use hand shaking input power wire, whether loose, if loose to screw up.
d.
No load.
e.
Whether measure up to 2X0V
±
15% make use of voltmeter, check input voltage.
(
2
)
Two kinds of LCD panel for choosing:
Panel New panel
A:
LCD display
B:
Bypass input indicator
C:
Mains input indicator
D:
Battery indicator
E:
Failure indicator
F:
Inverter indicator
G:
Overloads indicator
H:
Page-up button
I:
ON/OFF button
J:
Page-down button
A:
LCD display
B:
ON/OFF button
C:
Function button
D:
Bypass input indicator
E:
Mains input indicator
F:
Battery indicator
G:
Inverter indicator
H:
Failure indicator
Summary of Contents for JP5520
Page 1: ...USER S MANUAL JP5520 10 20KVA...
Page 23: ...23 10 Specifications...