Preparations
႑
Before commissioning, check that the charge circuit
and climate system are filled and well vented.
႑
Check the pipe system for leaks.
Filling
and
venting
the
heating
medium
system
1.
The heating medium system is filled with water to the
required pressure.
2.
Vent the system using the venting nipple (QM20) on
the enclosed flexible hose and possibly the cir-
culation pump.
40
Compressor
heater
JAMA Inverter
is equipped with a compressor heater that
heats the compressor before start-up and when the com-
pressor is cold.
NOTE
The compressor heater must have been con-
nected for 6 – 8 hours before the first start, see the
section “Start-up and inspection” in the installer
manual for the indoor section
Chapter
6
|
Commissioning
and
adjusting
30
6
Commissioning
and
adjusting
Summary of Contents for M8
Page 1: ...Installer manual LEK LEK LEK J M Inverter M8 M12 M16 Air water heat pump...
Page 2: ......
Page 16: ...LEK DATA XL2 UB1 UB2 XL1 UB3 W1 LEK DATA PF3 PF1 Chapter 3 The heat pump design 14...
Page 47: ...Electrical circuit diagram JAMA Inverter M8 Chapter 9 Technical data 46 Kaukora Oy...
Page 49: ...JAMA Inverter 12 Chapter 9 Technical data 48 Kaukora Oy...
Page 51: ...JAMA Inverter 16 Chapter 9 Technical data 50 Kaukora Oy...
Page 54: ......