10
Close view of the small recess marking on the F6 and F16.
Use glue to secure the F1R on the F2R and secure F1L on the
F2L.
Place some heavy thing on the F1R and use instant glue to se
-
cure the F1R on the F16 combination.
Place the F10, F11, F12, F13, F14, F19 and F28 on the working
table as the picture shown.
Try to fit the F5 on the F16, before the F6. Make sure the angle
between F16 and F5 is 90 degree.
Place F17A o the side board; don‘t over the marking line on the
picture.
Try to fit the F1L onto the F16. Make sure the angle between two
combinations is 90 degree.
Try to fit the F10, F11, F12, F13 and F14 into the fuselage. Check
if planking can fit into the right side of fuselage.
Use instant glue to secure the F5 in place.
Place F16, F1R and F1L combinations on the working table.
Place some heavy thing on the F1L and use instant glue to secu
-
re the F1L on the F16 combination.
Make sure all the planking can fit into the left side of fuselage.
Use rubber band to the hold the fuselage and use clip to secure
the tail in place for temporary. Make sure the front and rear part is
aligned and straight.
Place F1R, F1L, F2R, F2L, F15, F3 (2pieces) and F4 (2 pieces)
on the working table in order for assembling the side boards for
fuselage. Use instant glue to secure the F3 on the top of the side
board; secure F4 on the bottom of the side board and secure the
F15 on the tail.
Try to fit the F1R onto the F16 combination. Make sure the angle
between two combinations is 90 degree.
Top view of the front fuselage.
FUSELAGE ASSEMBLY
Summary of Contents for Fokker DVII
Page 16: ...16...
Page 17: ...17...
Page 27: ...27 Ailerons Elevator Rudder Installation of Electrical...