background image

OPERATION AND SAFETY 

INSTRUCTION MANUAL

Part Number: 16-14-600-GL

General Information

The Live Tracer is used to trace the 

path of live non-metallic gas mains. 
 The kit utilizes a traceable fiber-

glass rodder and a stuffing box to 

enable tracing while maintaining 

no blow by. 
Use with custom insertion tap tee 

for entry into gas mains. Use any 

transmitter and receiver to trace 

gas main from above ground. 

Jacket                    Core         Wire

1/4” OD Rod

DISCLAIMER

The foregoing instructions are provided by Jameson LLC to give guidance regarding the use of its gas line tracer products.  

Jameson LLC cannot be responsible for any use of its products that does not comply with these instructions.  However, you 

are also cautioned to comply with all instructions, regulations and requirements provide by the owner of the property and of 

the gas line, whether a utility company, governmental body or otherwise. You must also conform to and comply with all of 

your employer’s requirements.  To the extent of any questions or any conflicts between instructions from Jameson and from 

anyone else, please consult your supervisor as to the proper course of action.

800.346.1956

WWW.JAMESONLLC.COM

Electrofusion Insertion

Tapping Tee 

(Sold Separately)

Patent Pending

Summary of Contents for 16-14-600-GL

Page 1: ...e regarding the use of its gas line tracer products Jameson LLC cannot be responsible for any use of its products that does not comply with these instructions However you are also cautioned to comply...

Page 2: ...equip ment Failure to follow instructions could result in an accident causing serious injury Do not allow chil dren or untrained personnel to use this equipment Follow your company installation proced...

Page 3: ...ed operating personnel only This publication was written to assist in the training of personnel in the appropriate procedures and operating tech niques for joining polyethylene pipe with the Jameson I...

Page 4: ...apter Advance cutter with tapping tool until the stop is engaged completing hot tap Back out cutter with tapping tool and seal against top of tapping tee body This ensures cutter does not restrict flo...

Page 5: ...procedures provided with your equipment and those established by your company Install Rod into Stuffing Box 2 Remove cap of Stuffing Box by removing the 3 screws 3 INSPECT O RING If it shows any sign...

Page 6: ...below 45kHz Follow proper locating practices established by your company or your locating equipment manufacturer Removing the Rod 18 When tracing is complete pull rod back through Tap Tee and reinsta...

Page 7: ...led rod Any resistance reading generally between 2 12 ohms indicates proper continuity 6 Remove end ferrule Clean rod end and end ferrule with cleaning solvent or alcohol to remove debris and glass fi...

Page 8: ...oupling 45 10 20 1 0 10 1 IPS Coupling 50 10 20 1 0 10 2 Insertion Tee 90 10 25 1 0 10 Clamping required on couplings Warranty Jameson products carry a warranty against any defect in material and work...