1.Clean joining surface of pipe with clean cloth to remove dirt or 

contaminates.  
2. Center Insertion Tee (while still in bag) on fusion area of pipe 

and mark pipe with permanent marker.
3. Utilizing scraping tool, scrape entire pipe surface required for 

Insertion Tee Saddle to remove oxidation until virgin material is 

exposed.  We recommend (not required) wiping fusion area of 

pipe with clean lint free 96% isopropyl alcohol wipe.

4. Do not touch fusion zone of pipe or Insertion Tee prior to fusion.  

5. Position Insertion Tee on scraped surface utilizing premarked 

area for proper alignment.

6. Remove Insertion Tee from bag and attach to main by utilizing 

plastic undercarriage.  It is imperative for a tight fit between Inser-

tion Tee and Polyethylene main.  Utilizing hand tool only tighten 

installation hardware until saddle of Insertion Tee comes into tight 

contact with main, yielding no movement.  Assure proper tight-

ness has been achieved by grabbing the outlet of the insertion 

tee verifying there is no movement of saddle on the main.   (Pipe 

ovality may create a gap between fusion mat and pipe.  If this 

occurs, remove Insertion Tee from main, re-round pipe prior to 

installation).  

1                               2

                 3

WARNING

TIGHTEN INSERTION TEE BOLTS WITH HAND TOOLS ONLY.  USE OF PNEUMATIC OR AIR TOOLS IS STRICTLY 

PROHIBITED AND OVERTIGHTENING CAN CAUSE NUT TO SEPARATE FROM FLANGE.

6

The information contained herein is technical data and specifications for the Jameson Insertion Tee.  Installation of the 

Jameson Insertion Tee should be done by qualified operating personnel only.

This publication was written to assist in the training of personnel in the appropriate procedures and operating tech-

niques for joining polyethylene pipe with the Jameson Insertion Tee.  This manual is designed as a training and instal-

lation guide and should be used solely for this purpose.  Permanent field installation should be done only by properly 

trained operators who have been certified in accordance with the requirements of the Department of Transportation.

The recommended joining procedures for the Jameson Insertion Tee detailed in this manual have been qualified in 

accordance with DOT CFR Title 49 Section 192.283.

Operators should study this manual and become familiar with all procedures prior to field operations of the Jameson 

Insertion Tee.

Technical data and procedures contained herein are based upon documented testing performed by the Quality Con-

trol Department, but operator should not rely upon it completely due to variations in field conditions.  These guidelines 

are given and accepted at operator’s risk. Jameson makes no guarantee of fusion results and assumes no liability in 

connection with its published guidelines.  The integrity of the polyethylene piping system is the final responsibility of the 

operator. 

 This publication is a training and installation manual only and 

is not a recommendation to infringe on any patents.

7. A Universal Electrofusion processor should be connected to an adequate power source (Minimum 5 KW generator, 

30 Amp Circuit. Do not utilize 20 Amp plug or extension cord).  

NOTE:  If utilizing generator

, warm generator up before plugging in processor (auto throttle should be in off position).

Installation of Insertion Tee 

(Sold Separately)

Summary of Contents for 16-14-600-GL

Page 1: ...e regarding the use of its gas line tracer products Jameson LLC cannot be responsible for any use of its products that does not comply with these instructions However you are also cautioned to comply...

Page 2: ...equip ment Failure to follow instructions could result in an accident causing serious injury Do not allow chil dren or untrained personnel to use this equipment Follow your company installation proced...

Page 3: ...ed operating personnel only This publication was written to assist in the training of personnel in the appropriate procedures and operating tech niques for joining polyethylene pipe with the Jameson I...

Page 4: ...apter Advance cutter with tapping tool until the stop is engaged completing hot tap Back out cutter with tapping tool and seal against top of tapping tee body This ensures cutter does not restrict flo...

Page 5: ...procedures provided with your equipment and those established by your company Install Rod into Stuffing Box 2 Remove cap of Stuffing Box by removing the 3 screws 3 INSPECT O RING If it shows any sign...

Page 6: ...below 45kHz Follow proper locating practices established by your company or your locating equipment manufacturer Removing the Rod 18 When tracing is complete pull rod back through Tap Tee and reinsta...

Page 7: ...led rod Any resistance reading generally between 2 12 ohms indicates proper continuity 6 Remove end ferrule Clean rod end and end ferrule with cleaning solvent or alcohol to remove debris and glass fi...

Page 8: ...oupling 45 10 20 1 0 10 1 IPS Coupling 50 10 20 1 0 10 2 Insertion Tee 90 10 25 1 0 10 Clamping required on couplings Warranty Jameson products carry a warranty against any defect in material and work...

Reviews: