10. Utilizing center line mark on coupling (while still 

in bag) mark the stab depth.

11. Scrape fusion area to stab depth.

12. Repeat process marking stab depth on 

Transition Fitting or Pipe Pup. 

13. Fuse coupling on transition or pipe pup.

14. Screw ball valve on to extension. Make sure 

valve is in “closed” position.

15. Remove Insertion Tee Cap and Install Test Cap 

to test saddle fusion and EF coupling fusion. 

16. Remove Test Cap from Insertion Tee and 

attach tapping tool to cutter with threaded adapter 

on tapping tool shaft. It may be necessary to back 

out cutter first to enable attachment of threaded 

adapter. 

Advance cutter with tapping tool until the stop is 

engaged completing hot tap. Back out cutter with 

tapping tool and seal against top of tapping tee 

body. This ensures cutter does not restrict flow of 

gas in tee outlet or rod insertion.

Installation of Insertion Tee (continued)

10                                           11

12                                     13

14                                     15

16

8. Make sure to check Insertion Tee fusion time and cooling time 

with reading on processor.  If readings match, start fusion.  If not, 

refer to instruction manual furnished by manufacturer of processor.

9. After fusion is complete, Clamping Device should remain in place 

during the recommended cooling time.  Plastic undercarriage may 

remain on pipe after fusion or may be removed after recommended 

Total Cooling Time.  Do not continue until Total Cooling Time has 

elapsed.

8-9

800.346.1956

WWW.JAMESONLLC.COM

Summary of Contents for 16-14-600-GL

Page 1: ...e regarding the use of its gas line tracer products Jameson LLC cannot be responsible for any use of its products that does not comply with these instructions However you are also cautioned to comply...

Page 2: ...equip ment Failure to follow instructions could result in an accident causing serious injury Do not allow chil dren or untrained personnel to use this equipment Follow your company installation proced...

Page 3: ...ed operating personnel only This publication was written to assist in the training of personnel in the appropriate procedures and operating tech niques for joining polyethylene pipe with the Jameson I...

Page 4: ...apter Advance cutter with tapping tool until the stop is engaged completing hot tap Back out cutter with tapping tool and seal against top of tapping tee body This ensures cutter does not restrict flo...

Page 5: ...procedures provided with your equipment and those established by your company Install Rod into Stuffing Box 2 Remove cap of Stuffing Box by removing the 3 screws 3 INSPECT O RING If it shows any sign...

Page 6: ...below 45kHz Follow proper locating practices established by your company or your locating equipment manufacturer Removing the Rod 18 When tracing is complete pull rod back through Tap Tee and reinsta...

Page 7: ...led rod Any resistance reading generally between 2 12 ohms indicates proper continuity 6 Remove end ferrule Clean rod end and end ferrule with cleaning solvent or alcohol to remove debris and glass fi...

Page 8: ...oupling 45 10 20 1 0 10 1 IPS Coupling 50 10 20 1 0 10 2 Insertion Tee 90 10 25 1 0 10 Clamping required on couplings Warranty Jameson products carry a warranty against any defect in material and work...

Reviews: