10. Utilizing center line mark on coupling (while still
in bag) mark the stab depth.
11. Scrape fusion area to stab depth.
12. Repeat process marking stab depth on
Transition Fitting or Pipe Pup.
13. Fuse coupling on transition or pipe pup.
14. Screw ball valve on to extension. Make sure
valve is in “closed” position.
15. Remove Insertion Tee Cap and Install Test Cap
to test saddle fusion and EF coupling fusion.
16. Remove Test Cap from Insertion Tee and
attach tapping tool to cutter with threaded adapter
on tapping tool shaft. It may be necessary to back
out cutter first to enable attachment of threaded
adapter.
Advance cutter with tapping tool until the stop is
engaged completing hot tap. Back out cutter with
tapping tool and seal against top of tapping tee
body. This ensures cutter does not restrict flow of
gas in tee outlet or rod insertion.
Installation of Insertion Tee (continued)
10 11
12 13
14 15
16
8. Make sure to check Insertion Tee fusion time and cooling time
with reading on processor. If readings match, start fusion. If not,
refer to instruction manual furnished by manufacturer of processor.
9. After fusion is complete, Clamping Device should remain in place
during the recommended cooling time. Plastic undercarriage may
remain on pipe after fusion or may be removed after recommended
Total Cooling Time. Do not continue until Total Cooling Time has
elapsed.
8-9
800.346.1956
WWW.JAMESONLLC.COM