LT_MO8
Example for fabricating permanent
installation for re-location of gas
main through insertion tee.
Alternate configuration for vertical insertion of rod:
Insertion Tee with 45º Elbow
(16-HVTTR required for tapping this configuration)
800.346.1956
WWW.JAMESONLLC.COM
FUSION TIME
COOLING TIME
TOTAL
COOLING TIME
Minimum
KVA
Minimum
Generator
Breaker
Seconds
Minutes
Minutes
In clamp position * and
prior to movement
Prior to pressure taps
and backfilling
1” CTS Coupling *
45
10
20
1.0
10
1” IPS Coupling*
50
10
20
1.0
10
2” Insertion Tee
90
10
25
1.0
10
* Clamping required on couplings
Warranty
Jameson products carry a warranty against any defect in material and workmanship for a period of one year from date of shipment
unless failure is due to misuse or improper application.
Jameson shall in no event be responsible or liable for modifications, alterations, misapplications or repairs made to its products by
purchaser or others.
This warranty is limited to repair or replacement of the product and does not include reimbursement for shipping or other expenses
incurred. Jameson disclaims any other express or implied warranty.