32
The green hose shown below will go to the start of boom 1. From the first coulter valve you will need 45, 50, or
70cm length hose to connect each coulter based upon which row spacing you are using. The blue hose will be the
start of boom 2, and the yellow hose will be the start of boom 3.
Diaphragm and Fertilizer Hose Placement
Manifold 1
Manifold 2
Manifold 3
Hose to go between
each coulter on the
same boom.