Page 8
Jandy
®
Pro Series, JXi
™
Pool & Spa Heater
5. Installation Steps
There are nine (9) steps to complete to ensure correct installation and
implementation of the gas conversion procedure. Failure to follow
steps exactly and in the consecutive order listed in this instruction
booklet (as well as all warnings, cautions, and notes associated with
each step) may result in improper operation of the heater and possible
property damage, personal injury, or death. Installation steps are as
follows:
• Step 1: Before You Start
• Step 2: Install the Gas Orifice
• Step 3: Install the Air Intake Orifice
• Step 4: Install the Fuel Line Sealing Grommet
• Step 5: Perform Gas Leak Test
• Step 6: Test the Inlet Pressure
• Step 7: Test the Gas Orifice Differential Offset Pressure
• Step 8: Check Normal Operating Sequence
• Step 9: Affix the Conversion Rating Plate to Heater
• Step 10: Complete and Send Mail-In Card
STEP 1: Before You Start
1. Verify you have all of the necessary parts (see Table 1).
2. Verify the parts in your kit are specific for the model/BTU
conversion (see Table 2).
3. Turn off the electrical power to the heater.
4. Turn off the main gas supply to the heater at the meter or the
manual gas cock outside the heater.
5. Make sure the filter pump is off and will remain off for the
duration of the installation procedure.
6. If the heater is below the surface level of the water in the pool or
spa, close all shut-off valves between the heater and the pool.