Page 15
CAUTION
The Power Center is not to be considered as suitable for use as Service Equipment. Therefore, it is
required to have the appropriate means of disconnection, circuit isolation, and/or branch circuit protection
installed
upstream
of the Power Center.
Figure 9. Removing the Power Center Mounting Brackets from Shipping Position
Remove the four (4) screws that
secure the brackets to the Power
Center during shipping
Mounting
Brackets
(2)
Figure 10. Mark Holes using Power Center Mounting Bracket
Mounting Bracket
Mark Holes on Mounting Surface
4"
4"
3.3 Installing AquaLink RS PureLink Power Center
NOTE
The Power Center should be located at or near the equipment pad.
1. Locate the Power Center at least five (5) feet or more away from pool/spa and five (5) feet off the
ground. All national, state, and local codes are applicable.
NOTE
For Canadian installations, the Power Center must be at least three (3) meters (9.8 feet) away from the pool/
spa and 1.5 meters (5 feet) above the ground.
2. The power center comes with two full length, heavy duty mounting brackets
fastened
to the back of the
Power Center during shipping. Remove the four (4) screws that are holding the two (2) brackets and
the cardboard shipping cover in place (see Figure 9). Remove and discard the cardboard.
3. Using the top mounting bracket as a guide, mark three (3) holes on the mounting surface where the
power center will ultimately reside (see Figure 10). Drill the holes in the mounting surface.
NOTE
The three mounting holes are four inches (4") apart center to center.
NOTE
Use heavy-weight screws. The Power Center with all available components installed weighs approximately 50
pounds.