                                                                 Installation Instructions Janfire Pellet Boiler Integral Typ 25

 

 

IA 32580002 EN_Ver5 

 Janfire 2014 

22(25

 

7.0 

Commissioning Report 

 
 
 

Customer details

 

Service Technican

 

Name: 

 

Address: 

 

Postcode: 

 

Telephone: 

 

Janfire Pellet boiler

 

Integral Typ 25

 

Date of Installation: 

Date of site visit: 

Maximum thermal output 

 

kW 

Estimated Annual Energy Yield 

 

kWh/annum 

Percentage to be met by boiler 

 

 

 

 

Fuel Displaced (if more than one,  
state the main one only)  

 

Natural Gas        

 

Oil                       

 

Coal                    

 

Electricity            

 

 

Note: 

Pellets boiler check list         ( Y/N )

 

 

Operator / User Training   ( Y/N ) 

 

Operators manual is present, including warranty 
& chimney certificate  

 

 

Customer has received explanation of 
stove / boiler functions / characteristics  
 

 

Cleaning tools are available 

 

Adjustment possibilities with respect to 
controls / operating instructions  
 

 

Pellet conforms to CENT, DIN Plus or ONORM 

 

Cleaning / Servicing procedures have been 
discussed with user  
 

 

Flue building consent has been granted 

 

A maintenance contract has been agreed 

 

Single flue in use (diameter ) Number of 
Bends? ( )  

 

 

Ignition starts correctly during start phase 

 

Sufficient access / clearance for cleaning  

 

 

Observe combustion during all heating 
output levels, manual & automatic  
 

 

Electric connection to switched spur 

 

Combustion air calibrated on emission test 
with extern gas analyser.  
 

 

Summary of Contents for Integral 25

Page 1: ...Installation Instructions Janfire Pellet Boiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 1 25...

Page 2: ...5 Janfire 2014 2 25 Due to the continuous development in methods design and manufacture the contents of this document may change at any time and without prior notice Janfire AB do not accept any respo...

Page 3: ...5 2 Technical Data 6 3 General 10 4 Installation 11 4 1 Delivery Contents 11 4 2 Flue 12 4 3 Boiler 14 4 4 Burner 15 4 5 Filling with Water 15 4 6 Ash Removal and Sweeping 16 4 7 Using the Automatic...

Page 4: ...hat are manufactured and approved by Janfire AB 1 2 Conventions The following conventions are used in these instructions DANGER The text DANGER is used when there is a risk of personal injury or death...

Page 5: ...eeping contractor The burner is equipped with a safety cut out that prevents operation of the burner with the burner desmounted The boiler door is locked with a sturdy nut and cannot be open without t...

Page 6: ...ater resistance at 20 K difference between flow and return line 14 1 mbar Ash fire box 100 litres Weight 280 kg Boiler type Nor condensing negative pressure controlled Hot water High efficiency heat e...

Page 7: ...oiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 7 25 Accessories A Automatic sweeping Periodic controlled Placed on the left side B Automatic ash outflow Placed on the left or the right side C...

Page 8: ...Installation Instructions Janfire Pellet Boiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 8 25 Figure 1 Automatic sweeping ash outflow A B C...

Page 9: ...Installation Instructions Janfire Pellet Boiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 9 25 Figure 2 Janfire Pellet Boiler dimensions...

Page 10: ...tallation of the burner When the door is opened the burner remains on the door This makes it very easy to clean the combustion chamber and burner The door is also equipped with a safety cut out which...

Page 11: ...5 4 Installation 4 1 Delivery Contents The delivery of the Janfire pellet boiler should include the following Ready assembled Janfire pellet boiler without burner Sweeping brush Plug and socket for 23...

Page 12: ...d be connected at the same level as the boiler outlet is placed You may pull the tube straight up from the boiler WARNING Product damage Note Never pull the flue downwards Flue gas outlet R1 Storage T...

Page 13: ...er flue connection then seal up the old hole and make a new hole at the right level The Janfire pellet boiler flue is shaped like a T tube The T tube allows the boiler to be connected from the sides o...

Page 14: ...e the storage tank shall be used connect it with the connections on the backside Plug and socket for connecting to power circulation pump and burner are supplied The soot sweeping mechanism is mounted...

Page 15: ...ore starting the boiler ensure that the system is filled with water that electrical connections are correct and that pumps are functioning Note The tube system should be rinsed out before the boiler i...

Page 16: ...s 1 the maximum interval for ash check and cleaning is 10 12 months 1 Stop the burner see burner instructions 2 Wait for approximately 30 minutes until all the pellets are no longer glowing 3 Open the...

Page 17: ...down Note Do not forget to clean the boiler flue so that ash does not prevent the smoke from going out into the chimney 4 7 Using the Automatic Sweeping Cleaning mechanism starts automatically after a...

Page 18: ...the boiler pump and burner During operation the following can be read on the display of the control panel Water temperature Figure 2 Control Panel Figure 5 Temperature limiter 5 1 Location of sensors...

Page 19: ...Installation Instructions Janfire Pellet Boiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 19 25 Figure 6 Location av sensors Figure 7 Ash timer 5 2 Ash Timer...

Page 20: ...oiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 20 25 Figure 8 Ash time relay Ash On time 1 10 min Select on time is variable between 1 10 min default 1 min Ash Off time 6 60 min Select Off tim...

Page 21: ...Installation Instructions Janfire Pellet Boiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 21 25 6 0 Electrical Connection Plan...

Page 22: ...ators manual is present including warranty chimney certificate Customer has received explanation of stove boiler functions characteristics Cleaning tools are available Adjustment possibilities with re...

Page 23: ...ellets stored properly and dry Additional Boiler Inspection Flow return pipes connected correctly HT switch tested Expansion vessel fitted to system cap ltr Heating system purged correctly Buffer tank...

Page 24: ...Installation Instructions Janfire Pellet Boiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 24 25 8 2 Exhaust fan...

Page 25: ...Installation Instructions Janfire Pellet Boiler Integral Typ 25 IA 32580002 EN_Ver5 Janfire 2014 25 25 8 3 Automatic sweeping...

Reviews: