18
z
Place a bobbin in the bobbin case making sure the
thread winds clockwise on the bobbin as illustrated.
x
Draw the thread through the slit
q
of the bobbin case.
q
slit
c
Continue to draw the thread under the tension
spring
w
and through the opening
e
.
Pull out about 4
˝
(10 cm) of thread.
The bobbin should spin clockwise when the thread
is pulled out of the bobbin case.
w
Tension spring
e
Opening
1
2
3
Inserting a Bobbin
q
w
e
Inserting the Bobbin Case into the Hook
z
Holding the latch
q
open, position the bobbin case into the
hook aligning the slot
w
with the rib
e
.
The bobbin case should lock into place when the latch is
released.
q
Latch
w
Slot
e
Rib
x
Close the hook cover
r
and attach the hook cover plate
t
in this order.
r
Hook cover
t
Hook cover plate
z
x
c
z
x
q
w
e
r
t