installation instructions
Model Buster V
page 11 of 16
®
JARVIS
6206002;::::
PRODUCTS CORPORATION
33 ANDERSON ROAD, MIDDLETOWN, CONNECTICUT 06457-4926
UNITED STATES OF AMERICA EMAIL.
jarvis.products.corp@snet.net
TEL. 860-347-7271 FAX. 860-347-6978 WWW
.jarvisproducts.com
Power from
Starter
Control
Figure 2
To Starter Coil
By Customer
AC Supply
Rear Handles
Top Handle
20 ft.
Safety
Kill
Switch
2 ft.
1 Install the electrical control box in a dry location that
will not be subject to wash downs.
2 Wire the electrical control box.
Refer to figures 1 and 2.
2.1 Attach wires numbered 1, 2 and 3 to the appropri-
ate AC power supply. Check the label (item 1,
page 10) inside the control box cover for the cor-
rect voltage and frequency.
2.2 Attach wires numbered 4 and 5 to a starter coil
(supplied by the customer).
Disconnect any oth-
er source of power to the starter coil. The coil op-
erating voltage is indicated on the label (item 1,
page 10) inside the control box cover.
2.3 The connection between the Buster V and the
control box is pre--wired and is approximately 22
feet long.
3 Wire the motor.
3.1 Follow the wiring diagram shown on page 15 for
all dual voltage (6 or 9 wire) motors. All motors
require a power cord with three leads plus an
earth ground.
3.1.1 Make sure that rear wheel (item 51, Figure
B, page 5) rotates counterclockwise.
Note: the power supply must be con-
nected to perform the above test only.
4 Install the balancer above the work station on a
trolley.
4.1 The trolley should have sufficient travel to allow
the operator to reach the entire work area.
Refer
to figure 3 for dimensions.
12
3
/
4
in.
19
3
/
4
in.
Rail thickness 1 in.
Overall length 57 in.
Figure 3
Frame
Thickness
1
3
/
4
in.