9
Connection of the distribution box
1
2
3
4
1. Distribution box power switch.
2. Fuse of 60A or more to be applied to machine of
500A, while fuse of 40A or more to be applied to
machine of 350A
3.Welder Cable(4*6mm
2
for MIG500, 4*6mm
2
for
MIG400 and MIG350
)
4. Olivine Ground Cable (Ground connection! NOT
Zero Line Connection)
Please connect per the wiring map or other correct
wiring way. Please turn off the power supply during
connection.
Warning
:
Power Off during Connection
!
▲All connection has to be done by qualified
operators.
▲Don’t connect two welders in the same fuse-box.
▲If the cover of the machine is grounded, no ground
connection of no. # 4 cable.
4.5 Gas cylinder connection
Attention
:
1. Connection has to be done by
qualified and licensed operators.
2. Please read CO
2
heating gas meter’s
manual carefully before connection.
Summary of Contents for MIG 350P
Page 13: ...11 4 6 2 Separated machine installation Figure 4 3 ...
Page 19: ...17 3 Operation modes Table 5 2 DC MIG operation modes Modes Sketch map 2T 4T ...
Page 20: ...18 Repeat Spot weldin g 5 2 3 Pulse MIG 1 Synergic and Separate ...
Page 22: ...20 2T with initial crater 4T ...
Page 23: ...21 4T with initial segmen t Special 4T pro gram 4T ...
Page 40: ...38 7 Wiring Diagram ...
Page 42: ...40 ...