Jason International, Inc. •
501.771.4477
Page 2 of 26
Customer Service : 800.255.5766
Copyright © 2014 Jason International, Inc.
INSTALLATION INSTRUCTIONS
Figure 1
Figure 2
AC635PS AC553PS
InsTallaTIOn
Remove the product from its packaging. Read the entire
instructions prior to installing this product.
See the USER MAINTENANCE INSTRUCTIONS section of
this owner’s manual prior to installation for humidity and
mold prevention suggestions.
1. Remove the packing board from the skirt by placing the
bath and skirt assembly upside down and remove the four
press-in fasteners. See Figure 1.
Caution: Place bath deck on a surface that will not
scratch the acrylic surface of the bath.
2. Disassemble the bath from its skirt by removing the four (4)
nuts and washers located at the bottom of the bath with a
½" open ended wrench. Lift the skirt out of the bath. Place
the skirt and the bath in an upright position next to each
other. See Figure 1.
3. Set aside the template and locating stud kit, these will
be used later.
For AirMasseur
®
baths, remove the blower with stand,
check valve, tubing with (2) clamps, Sani Design™ Cleaning
System kit and electronics from the separate blower carton.
Set aside to be installed later.
For baths with the AEC Equipment Cabinet, set the AEC
carton aside to be installed later
4. Cardboard bath-well protector. Each bath is provided
with a cardboard bath-well protector that should be kept in
the unit throughout the bathroom construction process.
Note: Overflow drains, fill spouts, and valves must be
installed according to the instructions herein.
5. Installation template. An installation template is provided
to locate the floor drain position, sump area position, locat-
ing studs, remote blower tubing floor cutout position (when
applicable), water inlet stub-out position and skirt center
lines. Tape the template to the sub-floor in the desired loca-
tion.
6. Mark on the sub-floor the sump area position, the water
inlet stub-out position, and the remote blower-tubing floor
cut out position (when applicable). One remote blower
tubing, floor cutout position and four (4) water inlet stub-out
positions have been indicated on the template. Choose the
water inlet stub-out position that is preferable for your instal-
lation.
7. Remove the template and cut out the floor.
CAUTION: The floor drain location must be installed
according to the template. This location is critical to
the proper installation of this product.
Note: You must keep the template; it will be needed
during the next step of the installation process.
Note: Refer to Figure 2 to determine which cut-outs are
designed for use with your particular model.