background image

Jason International, Inc.  •  

 

501.771.4477  

 

 

 

Page 6 of 15

 

 

 

 

Customer Service :  800.255.5766 

Copyright © 2010 Jason International.

Figure  9

INSTALLATION INSTRUCTIONS (cont.)

Figure  8

LEVELFORM BASE

PS SKIRT CLIP

SKIRT

PVC FLEX PIPE

FINISHED FLOOR

OVERFLOW

ELECTRICAL

WARNING:  Verification of electrical requirements MUST be made 

before  installation.    Refer  to  the  Pump  and/or  Blower  labels  for 

voltage and frequency requirements.

Note: 

 Verify that the electrical service matches either the 

120v or 240v system as required for this bath.  

Note:  

The electrical equipment must not be exposed to 

direct or indirect water or moisture contact. The electrical 
equipment must also be protected from dust and other 
airborne debris before, during, and after installation.

DANGER — RISK OF ELECTRIC SHOCK: 

Connect only to a 

circuit protected by a Ground Fault Circuit Interrupter 
(GFCI). In the unlikely occurrence of a current imbalance 
in the power conductors, the GFCI will interrupt the power 
to the bath.

1. 

Electrical Service:

  A licensed electrician must provide 

the “dedicated” electrical service protected by a GFCI. 
The location of the GFCI must be at least five (5) feet 
[152 cm] away from the inside surface of the bath and 
accessible for regular testing.

 Use copper conductors 

only. 

  WARNING: The electrical service to the GFCI must not be 

interrupted by any control device.

 Likewise, the electrical 

service from the GFCI to the bath control should be 
direct and not interrupted by a switch. Never use a 
switch in conjunction with a control device. This will 

VOID 

THE MANUFACTURER’S WARRANTY.

2.  GROUNDING IS REQUIRED.  

The unit should be installed 

by a qualified service representative and properly 
grounded.

3.  Control Box:

 

Standard Edition AirMasseur

®

  The blower is prewired to its control box. The control 

box has a 36 inch [91 cm] cord with a plug end. The 
AirMasseur

®

 control box is mounted on a stand. This 

stand is temporarily secured to the packing board for 
shipping. During installation, the control box and mount 

must be positioned horizontally and located to permit 
access for inspection and servicing. The AirMasseur

®

 

control box must be plugged into a dedicated 120v or 
240v (volt), 15A (amp), 50/60Hz (hertz), Ground Fault 
Circuit Interrupter (GFCI) protected circuit.

 

Refer to the 

AirMasseur

® 

Control Box Connections section on page 8 

for proper installation.

 

Note:

  Verify required electrical service for this bath.

 

  Signature Edition AirMasseur

®

  The blower is prewired to its control box with a 36 inch [91 

cm] cord. The AirMasseur

®

 control box is mounted on a 

stand. During installation, the control box and mount must 
be positioned horizontally and located to permit access 
for inspection and servicing. The AirMasseur

®

 control box 

must be connected to a dedicated 240v (volt), 15A (amp), 
50/60Hz (hertz), Ground Fault Circuit Interrupter (GFCI) 
protected circuit.

  

Refer to the AirMasseur

® 

Control Box 

Connections section on page 8 for proper installation.

 

  INSTALL SERVICE CONNECTION AND OZONE UNIT AT LEAST 

6 INCHES [15 cm] ABOVE SUB FLOOR.

DANGER: Do not alter the factory installed wiring.

 Route all 

building materials and wiring away from the blower body or 
other heat-producing components of the unit.

ALL LOCAL AND STATE ELECTRICAL AND PLUMBING CODES 

MUST BE OBSERVED. 

Where there are no local codes the 

National Electric Code (NEC)

 and 

Uniform Plumbing Code (UPC)

 

shall be observed.  It is the responsibility of the installer/
owner to determine specific code compliance prior to 
installation of the product.  

NOTE:

 In the Commonwealth of Massachusetts, installation 

is to be done by a Massachusetts licensed plumber.

Summary of Contents for AC635PS

Page 1: ...y and is the responsibility of the installer ALL WARRANTY CLAIMS ON ACRYLIC SURFACE DAMAGE MUST BE MADE PRIOR TO INSTALLATION To protect the unit from damage keep the bath in its carton until ready for installation EQUIPMENT ACCESS In accordance with Building Codes service access to all therapy bath equipment controls and electrical connections must be provided during installation Insufficient acc...

Page 2: ...nd four 4 water inlet stub out positions have been indicated on the template Choose the water inlet stub out position that is preferable for your installation 9 Remove the template and cut out the floor CAUTION The floor drain location must be installed according to the template This location is critical to the proper installation of this product Note You must keep the template it will be needed d...

Page 3: ...ount a deck mounted diverter valve on the deck of the bath If a hand held shower is desired consider a floor mounted faucet or a faucet with an above deck diverter If a floor mounted faucet is desired be sure to install the faucet to allow for sufficient overhang into the well of the bath This will ensure an unobstructed water flow out of the faucet when filling the bath Follow the faucet manufact...

Page 4: ...n factory installed following E T L guidelines During installation if remote mounting of the blower and its control box is desired follow these procedures Note Do not remote mount the blower and control box more than 15 feet 457 cm away from the air inlet of the bath Choose a location as close as possible to the bath to assure maximum efficiency 1 Determine layout The installer is to determine the...

Page 5: ...not use a sand bed to install or level the bath Note The bottom of the bath s Level Form Base must be 1 8 lower than the bottom of the skirt 11 Drain and overflow Complete the installation of the drain and overflow per the instructions included with the drain and overflow 12 Test bath controls Before finishing the installation it is recommendedthatthebathcontrolsbetestedwithoutfilling the bath wit...

Page 6: ...trol Box Standard Edition AirMasseur The blower is prewired to its control box The control box has a 36 inch 91 cm cord with a plug end The AirMasseur control box is mounted on a stand This stand is temporarily secured to the packing board for shipping During installation the control box and mount must be positioned horizontally and located to permit access for inspection and servicing The AirMass...

Page 7: ...temperature sensor must be plugged into the proper receptacles for correct operation of the AirMasseur system See Figure 12 for connections A The junction box for the blower control box must be connected into a 240v 15 amp GFCI dedicated circuit B Pre wired power cord to blower C and ozone unit G Six pin mini DIN terminals for the water temperature sensor D and LED light E to the control box Eight...

Page 8: ... may be restored by using a quality plastic polish i e Novus Plastic Polish No 2 It is always preferable to protect the acrylic surface during installation to minimize cleanup and prevent surface damage INSTALLATION INSTRUCTIONS cont WATER TESTING Before finishing the installation it is recommended that the bath be water tested and the plumbing tested for leaks 1 Before water testing the bath make...

Page 9: ...TIC PURGE Twenty 20 minutes after the control has shut off and the bath is completely drained the blower will start again for a 2 minute purge cycle that dries the air channel Note that the LCD display will read PURGE and begin to countdown the 10 or 20 minute pause before the purge cycle begins The readout will display PURGE ON during the purge cycle Any time during the pause before the purge cyc...

Page 10: ...g the plumbing lines clean and fresh The ozone system works automatically in conjunction with the blower motor Touchpad A main control touchpad mounted on the bath deck features an LCD readout which alternately indicates the water temperature 5 F 15 C and air bath time remaining The touchpad operates all functions of the blower as well as the LED Mood light Refer to the Signature Edition AirMasseu...

Page 11: ... icon a third time moves the blower back to Constant mode Blower Speeds Icon The Blower Speeds icon is used to increase or decrease the blower speed once the blower is On Press and hold the icon to decrease the blower speed until the desired intensity is reached then release Pressandholdtheiconagaintoincreasetheblowerspeed until the desired intensity is reached The blower will return to its highes...

Page 12: ...Light Cycle is displayed if pressed for more than two 2 seconds Customized Settings The12characterLCDdisplaycanbecustomizedbypressing the Blower and Blower Speeds icons simultaneously for five 5 seconds while the system is Off Note The Blower Speeds icon will not be illuminated during this process Use the above figure to locate the icon A menu see below will bedisplayedtochoosethefollowing Purge24...

Page 13: ...VE liquid detergent solution i e glass cleaner and a soft wet cloth or sponge Do not run the air system with foaming cleaners or soaps Rinse the bath thoroughly after cleaning SURFACE MAINTENANCE Areas with minor scratches or dull surfaces can be restored by applying commercially available plastic polish i e Novus Plastic Polish No 2 available at your Jason dealer followed by an application of acr...

Page 14: ...nto the outlet c Keypad is disconnected c Check and reconnect if necessary Blower shuts off by itself or before time elapses a Blower motor overheated and thermal protection device deactivated motor possibly low voltage a Check that blower has sufficient ventilation and that the intake into the blower is not blocked Clear and allow the motor to cool down Check service wire size b GFCI tripped b Re...

Page 15: ...h the possibility of drowning Never use the therapy bath while under the influence of alcohol anticoagulants stimulants antihistamines vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using a therapy bath G Persons using medication...

Reviews: